Difference between revisions of "Main Page"

From Ministry of Water DCOM Manual
Line 14: Line 14:
 
[[Image:Volume_III_2020-03-06.png|220px|link=Volume III: Preface]]
 
[[Image:Volume_III_2020-03-06.png|220px|link=Volume III: Preface]]
 
<h4>Volume III: Construction Supervision for<br />
 
<h4>Volume III: Construction Supervision for<br />
Water Supply and Sanitation Projects <br /> </h4>[[Volume III: Preface|Readmore...]]
+
Water Supply and Sanitation <br /> Projects <br /> </h4>[[Volume III: Preface|Readmore...]]
  
 
|valign="top" |
 
|valign="top" |
 
[[Image:Volume_IV_2020-03-06.png|220px|link=Volume IV: Preface]]
 
[[Image:Volume_IV_2020-03-06.png|220px|link=Volume IV: Preface]]
<h4>Volume IV: Operation and Maintenance of Water<br />
+
<h4>Volume IV: Operation and Maintenance <br /> of Water
Supply and Sanitation Projects <br /> </h4>[[Volume IV: Preface|Readmore...]]
+
Supply and <br /> Sanitation Projects <br /> </h4>[[Volume IV: Preface|Readmore...]]
 
|}
 
|}

Revision as of 08:55, 7 March 2020

The four volumes of the DCOM manual have been prepared in order to facilitate effective complimentary planning, design, construction supervision as well as operation and maintenance of water supply and sanitation projects for urban, peri-urban and rural areas of Tanzania. The manuals will also assist the staff of the Ministry responsible for Water to undertake their supervisory and coordination roles well and the consultants to undertake designs using the guidelines recommended in the MoW manual.

Volume I 2020-03-06.png

1 Volume I: Design of Water Supply Projects

Readmore...

Volume II 2020-03-06.png

2 Volume II: Design of Sanitation Projects

Readmore...

Volume III 2020-03-06.png

3 Volume III: Construction Supervision for
Water Supply and Sanitation
Projects

Readmore...

Volume IV 2020-03-06.png

4 Volume IV: Operation and Maintenance
of Water Supply and
Sanitation Projects

Readmore...