Difference between revisions of "DCOM Volume I"

From Ministry of Water DCOM Manual
(2 intermediate revisions by the same user not shown)
Line 41: Line 41:
 
| 17 || [[Chapter Thirteen: Role of Stakeholders in Design of Water Supply Projects|Chapter Thirteen: Role of Stakeholders in Design of Water Supply Projects]] || 228
 
| 17 || [[Chapter Thirteen: Role of Stakeholders in Design of Water Supply Projects|Chapter Thirteen: Role of Stakeholders in Design of Water Supply Projects]] || 228
 
|-
 
|-
| 18 || [[Apendices: Appendices]] || 231
+
| 18 || Apendices: Appendices
|-
 
| ||
 
 
* [[DCOM Volume I Appendix A|Appendix A: Climate Change and Resilience to Climate Change ]]
 
* [[DCOM Volume I Appendix A|Appendix A: Climate Change and Resilience to Climate Change ]]
 
* [[DCOM Volume I Appendix B|Appendix B: Minimum Water Flow Requirement for Fire Fighting ]]
 
* [[DCOM Volume I Appendix B|Appendix B: Minimum Water Flow Requirement for Fire Fighting ]]
Line 57: Line 55:
 
* [[DCOM Volume I Appendix L|Appendix L: Standard Drawings ]]
 
* [[DCOM Volume I Appendix L|Appendix L: Standard Drawings ]]
 
* [[DCOM Volume I Appendix M|Appendix M: Selected Intake Designs ]]
 
* [[DCOM Volume I Appendix M|Appendix M: Selected Intake Designs ]]
||  
+
* [[DCOM Specification|Appendix O: Standard Specifications ]]
 +
|| 231
 
|}
 
|}

Revision as of 14:03, 31 March 2020