Pages with the most revisions

From Ministry of Water DCOM Manual

Showing below up to 100 results in range #1 to #100.

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

  1. Chapter Four: Off-Site Sanitation Systems‏‎ (372 revisions)
  2. Tanzania Ministry of Water Design Manual 4th Edition‏‎ (201 revisions)
  3. Chapter One: Introduction‏‎ (97 revisions)
  4. Chapter Two: procurement process for water supply and sanitation projects‏‎ (86 revisions)
  5. Main Page‏‎ (83 revisions)
  6. Chapter Three: Water Sources Analysis‏‎ (68 revisions)
  7. Chapter Ten: Pumping Machinery‏‎ (60 revisions)
  8. Appendix M: Standard Drawings‏‎ (51 revisions)
  9. Chapter One:Introduction‏‎ (49 revisions)
  10. Chapter Six: Sources of Water Supply‏‎ (46 revisions)
  11. DCOM Volume I‏‎ (45 revisions)
  12. Chapter Four: Water Demand Assessment‏‎ (41 revisions)
  13. DCOM Volume III Appendix 1‏‎ (39 revisions)
  14. Chapter Seven: Water Treatment‏‎ (38 revisions)
  15. List of Tables IV‏‎ (36 revisions)
  16. Chapter Two: Project Planning‏‎ (35 revisions)
  17. Chapter Twelve: Design Standards and Specifications‏‎ (33 revisions)
  18. Chapter Five: Pipelines Design‏‎ (33 revisions)
  19. List of Special Committee Members‏‎ (33 revisions)
  20. Chapter Three: contract management‏‎ (31 revisions)
  21. List of Figures IV‏‎ (30 revisions)
  22. Chapter Two: Life Cycle Cost and Service Delivery Approach‏‎ (30 revisions)
  23. Chapter Five: essential basic field construction skills‏‎ (29 revisions)
  24. Chapter Fifteen: Operation and Maintenance of Sanitation Projects‏‎ (29 revisions)
  25. Chapter One: Introduction III‏‎ (28 revisions)
  26. Chapter Twelve: Water Treatment‏‎ (28 revisions)
  27. List of Abbreviations I‏‎ (27 revisions)
  28. DCOM Volume I Appendix K‏‎ (26 revisions)
  29. Volume IV: Preface‏‎ (26 revisions)
  30. Chapter Fourteen: Drinking Water and Wastewater Quality Monitoring, Surveillance and Compliance‏‎ (23 revisions)
  31. Chapter Nine: Design of Water Structures‏‎ (23 revisions)
  32. Preface‏‎ (22 revisions)
  33. Acknowledgements‏‎ (21 revisions)
  34. Volume III: Preface‏‎ (20 revisions)
  35. GENERAL REQUIREMENTS‏‎ (20 revisions)
  36. DCOM Volume III Appendix 4‏‎ (20 revisions)
  37. Chapter Sixteen: Water Meters, Instrumentation Telemetry and Scada‏‎ (19 revisions)
  38. List of Abbreviations‏‎ (19 revisions)
  39. Chapter Five: Water Supply and Sanitation Projects‏‎ (17 revisions)
  40. DCOM Volume I Appendix D‏‎ (17 revisions)
  41. Chapter Six: Pumping Systems‏‎ (16 revisions)
  42. Chapter Eight: Treatment of Waters With Special Contaminants‏‎ (15 revisions)
  43. Chapter Thirteen: Role of Stakeholders in Design of Water Supply Projects‏‎ (15 revisions)
  44. Chapter Three: Operation and Maintenance Objectives for Water Projects‏‎ (15 revisions)
  45. List of Figures‏‎ (13 revisions)
  46. Chapter Eleven: Audit and Conservation of Energy‏‎ (13 revisions)
  47. Chapter Thirteen: Treatment for Special Water Sources‏‎ (13 revisions)
  48. Appendix N: Specifications‏‎ (12 revisions)
  49. Chapter Four: Operation and Maintenance Strategy‏‎ (12 revisions)
  50. PAINTING AND PROTECTIVE COATING‏‎ (12 revisions)
  51. List of Abbreviations III‏‎ (12 revisions)
  52. DCOM Volume I Appendix I‏‎ (11 revisions)
  53. Chapter Four: contract supervision and administration‏‎ (11 revisions)
  54. DCOM Volume III Appendix 5‏‎ (11 revisions)
  55. DCOM Volume I Appendix E‏‎ (11 revisions)
  56. DCOM Volume III Appendix 6‏‎ (11 revisions)
  57. List of Abbreviations IV‏‎ (10 revisions)
  58. Volume II: Preface‏‎ (10 revisions)
  59. DCOM Volume I Appendix B‏‎ (10 revisions)
  60. List of Tables‏‎ (9 revisions)
  61. CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS‏‎ (9 revisions)
  62. Chapter Seventeen: Water Audit and Leakage Control‏‎ (8 revisions)
  63. EARTHWORKS‏‎ (8 revisions)
  64. Subject Index: Subject Index‏‎ (8 revisions)
  65. PIPELINES‏‎ (8 revisions)
  66. Chapter Eleven: Metering‏‎ (8 revisions)
  67. DCOM Volume IV Appendix 1‏‎ (7 revisions)
  68. DCOM Volume I Appendix G‏‎ (7 revisions)
  69. DCOM Volume IV Appendix 5‏‎ (7 revisions)
  70. DIN SPECIFICATIONS‏‎ (7 revisions)
  71. Chapter Six: Stakeholder's Participation in Design of Sanitation Projects‏‎ (7 revisions)
  72. DCOM Volume I Appendix A‏‎ (7 revisions)
  73. List of Special Committee Members volume III‏‎ (6 revisions)
  74. References: References‏‎ (6 revisions)
  75. MISCELLANEOUS BUILDING WORKS‏‎ (6 revisions)
  76. SITEWORKS‏‎ (6 revisions)
  77. Chapter Eighteen: Revenue Including billing and Collection‏‎ (6 revisions)
  78. Chapter Three: On-Site Sanitation Systems‏‎ (6 revisions)
  79. TIMBER AND GLAZING‏‎ (5 revisions)
  80. Chapter Seven: Transmission Mains‏‎ (5 revisions)
  81. DCOM Specification‏‎ (5 revisions)
  82. DCOM Volume IV Appendix 9‏‎ (5 revisions)
  83. MASONRY AND PLASTER WORK‏‎ (5 revisions)
  84. References IV‏‎ (5 revisions)
  85. DCOM Volume III Appendix 3‏‎ (5 revisions)
  86. DCOM Volume I Appendix C‏‎ (5 revisions)
  87. Subject Index : Subject Index‏‎ (5 revisions)
  88. TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING‏‎ (5 revisions)
  89. Chapter Five: Design Standards and Specifications‏‎ (4 revisions)
  90. DCOM Volume I Appendix L‏‎ (4 revisions)
  91. DCOM Volume I Appendix M‏‎ (4 revisions)
  92. DCOM Volume IV Appendix 8‏‎ (4 revisions)
  93. Chapter Ten: Application Software‏‎ (4 revisions)
  94. List of Abbreviations 4‏‎ (4 revisions)
  95. Chapter Nine: Distribution System‏‎ (4 revisions)
  96. Chapter Nineteen: Community Participation and Compliant Redressal System in Operation and Maintenance of Water Supply and Sanitation Projects‏‎ (4 revisions)
  97. DCOM Volume I Appendix F‏‎ (4 revisions)
  98. Part A‏‎ (4 revisions)
  99. DCOM Volume IV Appendix 10‏‎ (3 revisions)
  100. DCOM Volume IV Appendix 2‏‎ (3 revisions)

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)