Pages without language links
From Ministry of Water DCOM Manual
The following pages do not link to other language versions.
Showing below up to 43 results in range #1 to #43.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- 1. Introduction
- Acknowledgements
- Appendix M: Standard Drawings
- Chapter Eight: Treatment of Waters With Special Contaminants
- Chapter Eleven: Metering
- Chapter Five: Design Standards and Specifications
- Chapter Five: Pipelines Design
- Chapter Four: Water Demand Assessment
- Chapter Nine: Design of Water Structures
- Chapter One: Introduction
- Chapter Seven: Water Treatment
- Chapter Six: Pumping Systems
- Chapter Six: Stakeholder's Participation in Design of Sanitation Projects
- Chapter Ten: Application Software
- Chapter Thirteen: Role of Stakeholders in Design of Water Supply Projects
- Chapter Three: On-Site Sanitation Systems
- Chapter Three: Water Sources Analysis
- Chapter Twelve: Design Standards and Specifications
- Chapter Two: Planning for Sanitation Projects
- Chapter Two: Project Planning
- DCOM Specification
- DCOM Volume I
- DCOM Volume I Appendix A
- DCOM Volume I Appendix B
- DCOM Volume I Appendix C
- DCOM Volume I Appendix D
- DCOM Volume I Appendix E
- DCOM Volume I Appendix F
- DCOM Volume I Appendix G
- DCOM Volume I Appendix H
- DCOM Volume I Appendix I
- DCOM Volume I Appendix J
- DCOM Volume I Appendix K
- DCOM Volume I Appendix L
- DCOM Volume I Appendix M
- DCOM Volume I ToC
- List of Abbreviations
- List of Special Committee Members
- Main Page
- Preface
- Tanzania Ministry of Water DCOM Manual 4th Edition
- Tanzania Ministry of Water Design Manual 4th Edition
- Volume II: Preface