Difference between revisions of "Tanzania Ministry of Water Design Manual 4th Edition"

From Ministry of Water DCOM Manual
Line 18: Line 18:
  
 
<div style="float:left; border:thin solid green; background-color:yellow">
 
<div style="float:left; border:thin solid green; background-color:yellow">
<h4>Volume III: Design, Construction Supervision,<br />
+
<h4>Volume III: Construction Suervision for<br />
Operation and Maintenance (DCOM) Manual <br /> </h4>
+
Water Supply and Sanitation Projects <br /> </h4>
 
</div>
 
</div>
  
 
<div style="float:right; border:thin solid green; background-color:red">
 
<div style="float:right; border:thin solid green; background-color:red">
<h4>Volume IV: Operation and Maintenance of Water <br> Supply and Sanitation Projects <br /></h4>
+
<h4>Volume IV: Operation and Maintenance of Water<br />
 +
Supply and Sanitation Projects <br /> </h4>
 
</div>
 
</div>

Revision as of 09:04, 5 March 2020

1 VOLUME I: DESIGN OF WATER SUPPLY PROJECTS

1.1 Chapter 1: Introduction

The preparation of this DCOM manual has been preceded by an overview of four important global consideration of Water Supply and Sanitation prior to reviewing the water and sanitation sector in Tanzania. It is followed by an explanation of the rationale for the preparation of the 4th edition. The introductory chapter is concluded by presenting the organization of the manual as well as the purpose and content of this volume of the DCOM.

1.2 Volume I: Design, Construction Supervision,
Operation and Maintenance (DCOM) Manual

1.3 Volume II: Design, Construction Supervision,
Operation and Maintenance (DCOM) Manual

1.4 Volume III: Construction Suervision for
Water Supply and Sanitation Projects

1.5 Volume IV: Operation and Maintenance of Water
Supply and Sanitation Projects