= Chapter Twelve: Design Standards and Specifications =
 
= Chapter Twelve: Design Standards and Specifications =
 +
== Design Standards ==
 +
<div style="text-align: justify">
 +
A Standard is a limit of a measure of quality of a product prepared for judgement
 +
and compliance by an authoritative agency, professional or a recognized body.<br>
 +
According to (Business Dictionary, 2020) Standards can be classified as:<br>
 +
* Government or statutory agency standards and specifications enforced by law,
 +
* Proprietary standards developed by a firm or organization and placed in public domain to encourage their widespread use, and
 +
* Voluntary standards established by consultation and consensus and  available for use by any person, organization, or industry.
  
== 1.1  Design Standards ==
+
Once established, standards (like bureaucracies) are very difficult to change or
A Standard is a limit of the measure of quality of a product prepared for judgement and compliance by an authoritative agency, professional or a recognized body. According to �(Business Dictionary, 2020)� Standards can be classified as:
+
dislodge. Standards that apply for water supply and sanitation projects will be as
 +
set by the Tanzania Bureau of Standards, and relate to construction works British
 +
standards .
  
Government or statutory agency for standards and specifications enforced by law,
+
The list of institutions whose standards are recommended to be used in designing
Proprietary standards developed by a firm or organization and placed in public domain to encourage their widespread use, and  
+
water projects is shown below:<br>
Voluntary standards established by consultation and consensus and available for use by any person, organization, or industry.
+
* Tanzania Bureau of Standards
 +
* British Standards (BS)
 +
* American Society for Testing and Materials (ASTM)
 +
* Deutsches Institut für Normung (DIN)
 +
* German institute for standardisation
 +
* American Association of State Highway and Transportation Officials(AASHTO)
 +
* European Standards(ES)
  
Once established, standards (like bureaucracies) are very difficult to change or dislodge. Standards that apply for water supply and sanitation projects will be from Tanzania Bureau of Standards, for construction works British standards shall be used.  
+
[[Image:Table12.1.PNG|700px|Chapter_Twelve:_Design_Standards_and_Specifications]] <br>
  
A list of institutions whose standards are recommended to be used in design is shown below;
+
For projects with requirements that are not covered by the above recommended
 +
standards, the designer should seek approval from the Tanzania Bureau of
 +
Standards (TBS)
  
# Tanzania Bureau of Standards,
+
== Specifications==
# British Standards (BS),
+
Specifications is a detailed description of how work is to be performed or
# American Society for Testing and Materials (ASTM)
+
requirements achieved, dimensions met, materials used. These are standards
# Deutsches Institut für Normung (DIN);
+
to be followed and tests carried out for the related product to meet acceptance
# German institute for standardisation,
+
criteria.
# American Association of State Highway and Transportation Officials (AASHTO),
 
# European Standards(ES),
 
  
Table 12.1 describes  standard codes of practice and relevant area for application construction works.
+
Specifications are normally drafted by the client to suit the need for a particular
 
+
work, for the purpose of construction of water projects standard specifications
=== Table 12.1  Common Standards Used in Water Projects ===
+
have been prepared for various woks as follows:<br>
{| class="wikitable"
 
|-
 
! No !! Name !! Institution!! Use of standard
 
|-
 
| 1 || BS 8110 of 1997|| British Standards || Code of practise for design and construction
 
|-
 
| 2 || BS 812 : Part 2 : 1995|| British Standards || Testing aggregates-
 
Methods of determination of density
 
|-
 
| 3 ||ISO 1167-1 Part 1 || International Standards (ISO) || Thermoplastics pipes, fittings and assemblies for the conveyance of fluids — Determination of the resistance to internal pressure
 
|-
 
| 4 || SO 1452-2 Part 2 || International Standards || Thermoplastics pipes, fittings and assemblies for the conveyance of fluids — Determination of the resistance to internal pressure
 
|-
 
| 5 || BS 6399 : Part 1 : 1996 || British Standards || Code of practice for dead and imposed loads
 
|-
 
| 6 || BS 1377-9: Part 9: 1990 || British Standards || Methods of test for Soils for civil engineering purposes: In-situ tests
 
|-
 
| 7 || DIN  1048 || Deutsches Institut fürNormung || Quality tests of concrete
 
|-
 
| 8 || DIN  4226 || Deutsches Institut für Normung || Concrete aggregates; definitions, sizes, quality requirements and testing
 
|-
 
| 9 || DIN  15018 || Deutsches Institut für Normung || Steel construction; basis for design and performance, calculations
 
|}
 
 
 
For projects with requirements that are not covered by recommended standards, the designer should seek approval from the Tanzania Bureau of Standards.(TBS)
 
 
 
== 1.2 Specifications ==
 
Specifications is a detailed description of how work is to be performed or requirements to be achieved, dimensions to be met, materials to be used, standards to be followed and tests carried out for the product to meet acceptance criteria.
 
 
 
Specifications are normally drafted by the client to suit the need for a particular work, for the purpose of construction of water projects standard specifications have been prepared for various woks as follows:
 
 
* Standard Specifications for Civil Works,
 
* Standard Specifications for Civil Works,
 
* Standard Specifications for Electrical works,  
 
* Standard Specifications for Electrical works,  
Line 58: Line 44:
 
* General Specifications.  
 
* General Specifications.  
  
These documents can be downloaded from Ministry’s Website customized to fit the needs of particular works.  
+
These documents can be downloaded from Ministry’s Website customized to fit
 +
the needs of particular works.
  
== 1.3 Materials ==
+
== Materials==
  
=== 1.3.1 Building Materials ===
+
=== Building Materials===
Building material is any material used for construction purposes such as materials for structures. wood, cement, aggregates, metals,sand, bricks, concrete, clay are the most common type of building material used in construction.The choice of these is based on their cost effectiveness for building projects or the designer also guards the designed facilities against corrosive compounds or chemicals.. Construction materials ranges from aggregates, sand, cement, wood, steel, e.t.c.
+
Building materialis any material used for construction purposes such as wood,
 +
cement, aggregates, metals,sand, bricks, steel, concrete, and clay. These are
 +
the most common types of building materials used in construction.The choice
 +
of these is based on theircost effectiveness for building projects. Appropriate
 +
materials help to guard the designed facilities against wear and tear, corrosive
 +
compounds or chemicals.
  
=== 1.3.2 Materials Testing ===
+
=== Materials Testing ===
Before materials are used for construction works, it is imperative for the contractor or the PE to conduct appropriate tests as per applicable standards indicated above. The following are the minimum tests proposed to be conducted on various construction materials.
+
Before materials are used for the construction of works, it is imperative for the
 +
contractor or the PE to conduct appropriate tests as per applicable standards
 +
indicated above. The following are the minimum tests proposed which should be
 +
conducted on various construction materials.
  
==== 1.3.2.1 Aggregates ====
+
==== Aggregates ====
Test of aggregates explained below includes both fine and coarse aggregates.
+
The test of aggregates explained below includes both fine and coarse aggregates.
  
===== Flakiness indextest =====
+
'''Flakiness indextest'''<br>
Flaky particles are those whose least dimension is 0.6 times lesser than the mean size. Thickness of these particles are comparatively smaller than the other two dimensions.
+
Flaky particles are those whose least dimension is 0.6 times lesser than the mean
Maximum allowable limit of the flaky particles in the mix is 30%. If it exceeds this value then the mix is considered unsuitable for construction purpose.
+
size. The thickness of these particles iscomparatively smaller than for the other
Flakiness index is the percentage by weight of flaky particles in a sample. The flakiness index is calculated by expressing the weight of flaky particles as a percentage of the total weight of the sample , test procedure is as outlined in BS – 812 ,1995 .
+
two dimensions.
  
===== Elongation index test =====
+
The maximum allowable limit of the flaky particles in amix is 30%. If it exceeds
Elongated particles are particles having length considerably larger than the other two dimensions, also  one dimension is 1.8 times greater than the other two dimensions. Maximum allowable limit of the flaky particles in the mix is 30%. If it exceeds this value then the mix is considered unsuitable for construction purpose.
+
this value then the mix is considered unsuitable for construction purpose.
 +
The flakiness index is the percentage by weight of flaky particles in a sample.
 +
The flakiness index is calculated by expressing the weight of flaky particles as a
 +
percentage of the total weight of the sample, test procedure is as outlined in BS
 +
– 812,1995.
  
Elongation index is the percentage by weight of elongated particles in a sample. The elongated Index is calculated by expressing the weight of elongated particles as a percentage of the total weight of the sample, test method is expalined in BS – 812 ,1995
+
'''Elongation index test'''<br>
 +
Elongated particles are particles having length considerably larger than the other
 +
two dimensions. One such dimension is 1.8 times greater than the other two
 +
dimensions. The maximum allowable limit of the flaky particles in the mix is 30%.
 +
If it exceeds this value then the mix is considered unsuitable for construction
 +
purposes.
  
Flaky and elongated particles lower the work ability of concrete mixes due to high ratio of surface area to volume. The presence of flaky and elongated particles also may cause inherent weakness in concrete  with possibilities of breaking down under heavy loads.
+
An elongation index is the percentage by weight of elongated particles in a sample.
 +
The elongated Index is calculated by expressing the weight of elongated particles
 +
as a percentage of the total weight of the sample, test method is expalined in
 +
BS – 812,1995
  
===== Abrasion (Los Angeles Abrasion Test) =====
+
Flaky and elongated particles lower the workability of concrete mixes due to
Abrasion test is the measure of aggregate toughness and abrasion resistance on crushing, degradation and disintegration. Test for abrasion is conducted based on BS 812: Part 113: 1990.
+
the high ratio of surface area to volume. The presence of flaky and elongated
 +
particles may also cause inherent weakness in concrete with possibilities of
 +
breaking down under heavy loads.
  
===== Organic Impurities Test =====
+
'''Abrasion (Los Angeles Abrasion Test)'''<br>
Sand should be checked for presence of organic impurities such as decayed vegetation, humus, and coal dust as these affect the quality of concrete. Test for organic impurities should be conducted as per. BS 812: Part 4: 1976
+
Abrasion test is the measure of aggregate toughness and abrasion resistance on
 +
crushing, degradation and disintegration. A test for abrasion is conducted based
 +
on BS 812: Part 113: 1990.
  
===== Aggregate Crushing value (ACV) test =====
+
'''Organic impurities test'''<br>
Aggregate crushing value test on coarse aggregates is a relative measure of the resistance of an aggregate crushing under gradually applied compressive load.Method for determination of Aggregate Crushing Value (ACV) is the Code: BS 812 Part 110,
+
Sand should be checked for the presence of organic impurities such as decayed
10% finer test
+
vegetation, humus, and coal dust as these affect the quality of concrete. Tests for
 +
organic impurities should be conducted as per. BS 812: Part 4: 1976.
  
The 10 per cent Fines Aggregate Crushing Value (10 % FACT) is determined by measuring the load required to crush a prepared aggregate sample to give 10 per cent material passing a specified sieve after crushing. Test procedure is outline as per code BS 812: 1990 Part III.
+
'''Aggregate crushing value (ACV) test'''<br>
 +
Aggregate crushing value test on coarse aggregates is a relative measure of the
 +
resistance of an aggregate crushing under gradually applied compressive load.
 +
The method for determination of Aggregate Crushing Value (ACV) is the Code: BS
 +
812 Part 110, 10% finer test.
  
===== Impact resistance value (AIC) test =====
+
The 10 per cent Fines Aggregate Crushing Value (10 % FACT) is determined by
The aggregate impact resistance value is a measure of resistance to sudden impact or shock, this value may differ from resistance to gradually applied compressive load. The procedure of Aggregate impact resistance value is provided in code BS 812 : Part 112 : 1990
+
measuring the load required to crush a prepared aggregate sample to give 10 per
 +
cent material passing a specified sieve after crushing. Test procedure is outline
 +
as per code BS 812: 1990 Part III.
  
===== Grading – sieve analysis test =====
+
'''Impact resistance value (AIC) test'''<br>
This is classification of a coarse-grained soil  based on the different particle sizes it contains. This aspect is important as it indicates the comprehensibility properties, shear strength and hydraulic conductivity. The standard gradation and sieve analysis test is: BS 812: Section 103.1: Sieve Analysis of Fine and Coarse Aggregates
+
The aggregate impact resistance value is a measure of resistance to sudden impact
 +
or shock, this value may differ from resistance to gradually applied compressive
 +
load. The procedure of Aggregate impact resistance value is provided in code BS
 +
812 : Part 112 : 1990.
  
===== Absorption test =====
+
'''Grading – sieve analysis test'''<br>
Water absorption is a measure of the porosity of the aggregates, it gives an indication of the strength of the aggregates. When more water is absorbed, the aggregates is more porous in nature and generally considered unsuitable unless found to be acceptable based on strength, impact and hardness tests. The standard method for Testing aggregates to water absorption test is according to BS 812-120:1989.
+
This is classification of a coarse-grained soil based on the different particle sizes
 +
it contains. This aspect is important as it indicates the compressibility properties,
 +
shear strength and hydraulic conductivity. The standard gradation and sieve
 +
analysis test is: BS 812: Section 103.1: Sieve Analysis of Fine and Coarse Aggregates
  
===== Specific gravity test =====
+
'''Absorption test'''<br>
The specific gravity of aggregate is the ratio of its mass to that of an equal volume of distilled water at a specified temperature. The standard method for Testing aggregates to determine the  density is BS 812 : Part  2 : 1995
+
Water absorption is a measure of the porosity of the aggregates. It gives an
 +
indication of the strength of the aggregates. When more water is absorbed,
 +
the aggregates is more porous in nature and generally considered unsuitable
 +
unless found to be acceptable based on strength, impact and hardness tests. The
 +
standard method for Testing aggregates to water absorption test is according
 +
to BS 812-120:1989.
  
===== Chemical content (pH,Chloride and Sulphate)Test =====
+
'''Specific gravity test'''<br>
This test aims at establishing permissible levels of chlorides and sulfates in aggregate, high levels  of chemicals may result in  deterioration of concrete by corrosion of steel reinforcement. Corrosion of steel affects serviceability and strength of concrete structures. The test to determine the content of chemicals in aggregates is conducted as per BS 812-Part 117 & 118:1988
+
The specific gravity of aggregate is the ratio of its mass to that of an equal volume
 +
of distilled water at a specified temperature. The standard method for Testing
 +
aggregates to determine the density is BS 812 : Part 2 : 1995.
  
==== 1.3.2.2 Water ====
+
'''Chemical content (pH, Chloride and Sulphate)Test'''<br>
===== Impurities Test =====
+
This test aims at establishing permissible levells of chlorides and sulfates in
Water for washing of aggregates and for mixing concrete shall be in accordance with DIN 4030 and DIN 1045 and shall be clean and free from objectionable quantities of organic matter, alkali, salts and other impurities. When TBS adopts the new standards that are under review as of know, the Tanzanian standards will be adopted.
+
aggregate, high levels of chemicals may result in deterioration of concrete
 +
by corrosion of steel reinforcement.Corrosion of steel affects service ability and
 +
strength of concrete structures. The test to determine the content of chemicals
 +
in aggregates is conducted as per BS 812-Part 117 & 118:1988.
  
===== Chemical content such as Chloride,pH values, Sulphate =====
+
==== Water ====
Samples of the water being used or which  is proposed to be used for mixing concrete shall undergo testing for quality to determine the concentration of sulphates and chlorides, which shall be such that the concrete mix as a whole complies with the specified limit for salt content. Chemical content in water may be determined through procedure explained in the code APHA 21st:2005 / ICP OES.
+
'''Impurities test'''<br>
 +
Water for washing aggregates and for mixing concrete shall be in accordance
 +
with DIN 4030 and DIN 1045 and shall be clean and free from objectionable
 +
quantities of organic matter, alkali, salts and other impurities. When TBS adopts
 +
the new standards that are under review as of now, the Tanzanian standards will
 +
be adopted.
  
==== 1.3.2.3 Cement ====
+
'''Chemical content such as chloride, ph values, sulphate'''<br>
===== Setting time Test =====
+
Samples of the water being used or which is proposed to be used for mixing
The settling time is the time required for cement to convert from a plastic paste to a non-plastic and rigid mass. The cement settling time is determined through procedures explained in the AASHTO T 131 and ASTM C 191: Time of Setting of Hydraulic Cement.
+
concrete shall undergo testing for quality to determine the concentration of
 +
sulphates and chlorides, which shall be such that the concrete mix as a whole
 +
complies with the specified limit for salt content. Chemical content in water may
 +
be determined through procedure explained in the code APHA 21st:2005 / ICP
 +
OES.
  
===== Comprehensive Strength Test =====
+
====Cement ====
The comprehensive strength of cement is the measure of the strength it provides to the mix after it has hardened .The test enables one to identify the quantity of cement required and how much strength it will provide. The comprehensive strength of cement is a basic data needed for mix design. Cement, basically identified by its comprehensive strength as grade 53 grade, 43 grade, 33 grade of cement. The test procedure to is as per code of practice BS EN 196-1:2005.
+
'''Setting time test'''<br>
 +
The settling time is the time required for cement to convert from a plastic paste
 +
to a non-plastic and rigid mass. The cement settling time is determined through
 +
procedures explained in the AASHTO T 131 and ASTM C 191: Time of Setting of
 +
Hydraulic Cement.
  
==== 1.3.2.4 Concrete Works ====
+
'''Compressive strength test'''<br>
Tests conducted for concrete includes
+
The compressive strength of cement is the measure of the strength it provides
 +
to the mix after it has hardened .The test enables one to identify the quantity of
 +
cement required and how much strength it will provide. The compressive strength
 +
of cement is a basic data needed for mix design. Cement, basically identified by
 +
its compressive strength as grade 53 grade, 43 grade, 33grade of cement. The
 +
test procedure to is as per code of practice BS EN 196-1:2005.
  
===== Slump test =====
+
==== Concrete Works ====
Concrete slump test or slump cone test is done to determine the work ability or consistency of concrete mix prepared in the laboratory or at the construction site when undertaking concreting. Concrete slump test should be carried out from batch to batch to check the uniform quality of concrete during construction.The slump test is carried out as per procedures mentioned in ASTM C143 in the United States, and EN 12350-2 in Europe.
+
Tests conducted for concrete includes:<br>
 +
'''Slump test'''<br>
 +
Concrete slump test or slump cone test is done to determine the workability or
 +
consistency of concrete mix prepared in the laboratory or at the construction site
 +
when undertaking concreting. Concrete slump test should be carried out from
 +
batch to batch to check the uniform quality of concrete during construction.
 +
The slump test is carried out as per procedures mentioned in ASTM C143 in the
 +
United States, and EN 12350-2 in Europe.
  
===== Comprehensive strength test: =====
+
'''Compressive strenght test''':<br>
Comprehensive strength of concrete is the measure of the Comprehensive strength which is the ability of the material or the structure to carry the loads on its surface without any cracks or deflection. Standard testing methods for Compressive Strength of Cylindrical Concrete Specimens is carried out using the procedure as stated in the American Society for Testing Materials ASTM C39/C39M.
+
Compressive strength of concrete is the measure of the Compressive strength
 +
which is the ability of the material or the structure to carry the loads on its surface
 +
without any cracks or deflection. Standard testing methods for Compressive
 +
Strength of Cylindrical Concrete Specimens is carried out using the procedure as
 +
stated in the American Society for Testing Materials ASTM C39/C39 M.
  
===== Concrete voids Test. =====
+
'''Concrete voids test'''<br>
This test method is related to the susceptibility of the cement paste portion of the concrete to damage by freezing and thawing. The test estimates the likelihood of damage of concrete due to cyclic freezing and thawing .The parameters of the air-void system of hardened concrete can be determined by the procedures described in the code AASHTO T 269.
+
This test method is related to the susceptibility of the cement paste portion of the
 +
concrete to damage by freezing and thawing. The test estimates the likelihood
 +
of damage of concrete due to cyclic freezing and thawing. The parameters of
 +
the air-void system of hardened concrete can be determined by the procedures
 +
described in the code AASHTOT 269.
  
==== 1.3.2.5 Steel ====
+
====Steel ====
===== Tensile strength =====
+
'''Tensile strength'''<br>
The tensile strength of steel is the measure of maximum amount of stress that can be taken before failure. Tensile strength should be conducted as per standards methods as provided in code of practise DIN 15018 or BS449 (1978/1984).
+
The tensile strength of steel is the measure of maximum amount of stress that can
 +
be taken before failure. Tensile strength should be conducted as per standards
 +
methods as provided in code of practice DIN 15018 or BS449 (1978/1984).
  
== 1.4 Soil Test ==
+
== Soil Test ==
=== 1.4.1 Methodology of conducting Soil Investigation for borehole and test pit ===
+
===Methodology of Conducting Soil Investigation for Borehole and Test Pit ===
 
There are several methods of soil investigation for engineering purposes.<br>
 
There are several methods of soil investigation for engineering purposes.<br>
  
i) Borehole drilling method <br>
+
(a) Borehole drilling method
This method used to collect soil materials from underneath by using Rig machine,heavy duty hand auger and light set hand auger.The diameter of the borehole is ranging from 150mm to 180mm depending the size of the bit to be used.During drilling, the following aspects should be observed:
+
This method used to collect soil materials from underneath by using Rig
* Visual soil classification and texture should be recorded,
+
machine, heavy duty hand auger and light set hand auger. The diameter of
* Water table shoul be observed and recorded,
+
the borehole ranges from 150 mm to 180 mm depending on the size of the
* Depth which includes collection of soil materials at difference depth depends on the changing of soil materials to be recorded.
+
bit used during drilling, the following should be observed:
* Labelling of soil at each depth and soil clasification
+
(i) Visual soil classification and texture should be recorded,<br>
* Collection of soil materials and keep in plastic bags to avoid moisture content
+
(ii) Water table should be observed and recorded,<br>
* Soil logging or profile should be shown as below table
+
(iii) Depth should include the collection of soil material at different depths
 +
depending on changes in soil materials to be recorded.<br>
 +
(iv) Labelling of the soil collected at each depth and include its classification<br>
 +
(v) Collection of soil materials and keep in plastic bags to avoid moisture
 +
content<br>
 +
(vi) Soil logging or profile should be shown as in the table below.<br>
  
Table 12.2: Soil logging of borehole or test pit
+
[[Image:Table12.2.PNG|750px|Chapter_Twelve:_Design_Standards_and_Specifications]] <br>
{| class="wikitable"
 
|-
 
! BH NO !! SNO !! DEPTH (M) !! SOIL DESCRIPTION !! REMARKS
 
|-
 
| 1 || 1|| 0.0-0.50 || Yellowish brown silt  clay SAND of medium plasticity || Co-ordinate
 
|}
 
  
ii) Test pit excavation method<br>
+
'''(b) Test pit excavation method'''<br>
This method including the digging of test pits with the following dimensions, 1.0m x1.5m to the maximum depth of 2.0m.The depth depends on hardness of the soil materials or hard rock.The equipment used for this method can be backhoe excavator, hoes and chisels.The collection of soil materials depends on the type of materials as mentioned for the borehole above including soil logging table.
+
This method includesthe digging of test pits with the following dimensions, 1.0 m
 +
x 1.5 m to the maximum depth of 2.0 m.The depth depends on hardness of the
 +
soil materials or hard rock.The equipment used for this method can be backhoe
 +
excavator, hoes and chisels.The collection of soil materials depends on the type
 +
of materials as mentioned for the borehole above including soil logging table.
  
=== 1.4.2 Soil Investigation for dams ===
+
=== Soil Investigation for Dams ===
In dam construction projects the soil investigation, collection and classification of soil should be done in the following sections,
+
In dam construction projects soil investigation, collection and classification should
 +
be done as in the following sections,
  
a).Along dam axis
+
'''a) Along dam axis'''<br>
The bore holes or test pits should be conducted along the dam axis at the intervals of 20m or 30m
+
The bore holes or test pits should be conducted along the dam axis at intervals
 +
of 20 m or 30 m
  
b).Reservor
+
'''b) Reservor'''<br>
The soil should be collected in left hand and right hand side towards to the fetch area (windward side) at intervals of 30m. The depth of these Boreholes (BH) and Test Pits (TP) depends on the soil strata and the presence of impervious materials (Clay) and hard rock.
+
The soil shoud be collected in left hand and right hand side towards the fetch
 +
area (windward side) at intervals of 30 m.The depth of these Boreholes (BH) and
 +
Test Pits (TP) depends on the soil strata and the presence of impervious materials
 +
(Clay) and hard rock.
  
c).Spillway section
+
'''c) Spillway section'''<br>
The Test pit or boreholes should be conducted along the spillway Chanel to determine the soil materials if it is eroded.materials or it is a rock (soft or hard rock) at the interval of 30m.
+
The Test pit or boreholes should be conducted along the spillway Chanel to
 +
determine the soil materials if it is eroded materials or it is a rock (soft or hard
 +
rock) at the interval of 30 m.
  
d).Borrow area section.
+
d) '''Borrow area section'''<br>
The borehole or test pit should be conducted on borrow area to determine the suitable soil materials for dam construction and to quantify the amount of materials to be used for dam construction.
+
The borehole or test pit should be conducted on borrow area to determine
 +
the suitable soil materials for dam construction and to quantify the amount of
 +
materials to be used for dam construction.
  
=== 1.4.3 Suitability of soil materials for dam construction ===
+
=== Suitability of Soil Materials for Dam Construction===
 
 
The soil materials suitable for earthen dam construction are of two types:
 
  
 +
The soil materials suitable for earthen dam construction are of two types:<br>
 
* Silty clay sand of medium plasticity and   
 
* Silty clay sand of medium plasticity and   
 
* Silty clay sand of high plasticity  
 
* Silty clay sand of high plasticity  
  
If the materials at the site are predominantly found to have a lot of silty clay sand of medium plasticity, the dam will be homogeneous which mean the same character of soil materials will be used. This should contain between 20 to 30 percent clay with balance made up of Silt, sand and some gravel. If a Unified Soil Classification has to be carried out, the selected clay should be in order of presence of, GC, CS, CL, and CH, CH. normally, homogeneous dams are confined to relatively small heights with maximum of 6m. For dams in excess of 6 metres, a zoned embankment is recommended. But if the site has plenty of silty sand clay of high plasticity, the dam will be zoned and both type of soil materials will be used whereby the high clay materials will form the inner part (core) while the medium will be outer part (shell materials).The above statement depends on the availability of the materials at the selected site. The zoned embankment is more stable.
+
If the materials at the site are predominantly found to have a lot of silty clay
 +
sand of medium plasticity, the dam will be homogeneous which means the same
 +
character of soil materials will be used. This should contain between 20 to 30
 +
percent clay with balance made up of Silt, sand and some gravel. If a Unified
 +
Soil Classification has to be carried out, the selected clays should be in order of
 +
presence of, GC, CS, CL, and CH. Normally, homogeneous dams are confined
 +
to relatively small heights with maximum of 6m.For dams in excess of 6metres,
 +
a zoned embankment is recommended. But if the site has plenty of silty sand
 +
clay of high plasticity, the dam will be zoned and both type of soil materials will
 +
be used whereby the high clay materials will form the inner part (core) while the
 +
medium will be the outer part (shell materials).The above statement depends on
 +
the availability of the materials at the selected site. The zoned embankment is
 +
more stable.
  
=== 1.4.4 Determination of In-Situ Bearing Capacity of the Soil ===
+
=== Determination of In-Situ Bearing Capacity of the Soil===
  
(a) In-situ bearing capacity<br>
+
'''(a) In-situ bearing capacity'''<br>
The in-situ bearing capacity of the soil should be determine in order to know the bearing capacity of the soil before implementation of the civil structure and can be used for preliminary design of the structure.
+
The in-situ bearing capacity of the soil should be determined in order to know the
There are several methods which are used to conduct in-situ bearing capacity of the soils
+
bearing capacity of the soil before implementation of the civil structure and can
 +
be used for preliminary design of the structure.
  
(i) Standard Penetration Test (SPT).<br>
+
There are several methods which are used to conduct in-situ bearing capacity of
This method is done by drilling of boreholes and conducting the SPT tests at the interval of 1.5m downwards. The number of blows is applied by using a free falling hammer of 63.5kg at the height of 750mm through the rod which is mounted with the cone of 600 at the tip end.
+
the soils<br>
 +
'''(i) Standard penetration test (SPT)'''<br>
 +
This method is done by drilling boreholes and conducting the SPT tests at the
 +
interval of 1.5 m downwards. The number of blows is applied by using a freefalling
 +
hammer of 63.5 kg at the height of 750 mm through the rod which is
 +
mounted with the cone of 60º at the tip end.
  
By means of a drop hammer of 63.5kg mass falling through a height of 750mm at the rate of 30 blows per minute, the sampler is driven into the soil. This is as per IS -2131:1963 (Indian standards). The number of blows of hammer required to drive a depth of 150mm is counted. The main aim is to perform standard penetration in order to obtain the penetration resistance (N-value).The number or blows required for 300mm penetration resistance of the soil. It is generally referred to as the 'N' value and is measured in blows/unit penetration. The Standard penetration test (SPT) is widely used to get the bearing capacity of the soil directly at a certain depth. The standard penetration test is an in-situ dynamic penetration test designed to provide information on the geotechnical engineering properties of soil.
+
By means of a drop hammer of 63.5 kg mass falling through a height of 750
 +
mm at the rate of 30 blows per minute, the sampler is driven into the soil. This
 +
is as per IS -2131:1963 (Indian standards). The number of blows of hammer
 +
required to drive a depth of 150mm is counted. The main aim is to perform
 +
standard penetration in order to obtain the penetration resistance (N-value).The
 +
number or blows required for 300 mm penetration resistance of the soil. It is
 +
generally referred to as the ‘N’ value and is measured in blows/unit penetration.
 +
The Standard penetration test (SPT) is widely used to get the bearing capacity
 +
of the soil directly at a certain depth. The standard penetration test is an in-situ
 +
dynamic penetration test designed to provide information on the geotechnical
 +
engineering properties of soil.
  
The main purpose of the test is to provide an indication of the relative density of granular deposits, such as sands and gravels from which it is virtually impossible to obtain undisturbed samples. The operation entails the operator counting the number of hammer strikes it takes to drive the sample tube 6 inches at a time. Each test drives the sample tube up to 450mm deep. It is then extracted and if desired a sample of the soil is pulled from the tube. The borehole is drilled deeper and the test is repeated’
+
The main purpose of the test is to provide an indication of the relative density of
 +
granular deposits, such as sands and gravels from which it is virtually impossible
 +
to obtain undisturbed samples. The operation entails the operator counting the
 +
number of hammer strikes it takes to drive the sample tube 6 inches at a time.
 +
Each test drives the sample tube up to 450mm deep. It is then extracted and
 +
if desired a sample of the soil is pulled from the tube. The borehole is drilled
 +
deeper and the test is repeated’
  
(ii) Dynamic cone penetration (DCP)<br>
+
'''(ii) Dynamic cone penetration (DCP)'''<br>
 
This method is the same as above but the dropping hammer is 10kg at a height of 1.m
 
This method is the same as above but the dropping hammer is 10kg at a height of 1.m
  
The Table No.4.3 shows indicators for penetration resistance of different types of soils based on the standard penetration tests in relation to the number of blows per 30cm of penetration (based on Terzaghi and Peck). The table shows relative densities of soils corresponding to the number of blows.
+
Table No 12.3 shows indicators for penetration resistance of different types of
 +
soils based on the standard penetration tests in relation to the number of blows
 +
per 30 cm of penetration (based on Terzaghi and Peck).The table shows relative
 +
densities of soils corresponding to the number of blows.
  
Table 12.3: Number of blows comparison to soil type based on SPT
+
[[Image:Table12.3.PNG|755px|Chapter_Twelve:_Design_Standards_and_Specifications]] <br>
{| class="wikitable"
 
|-
 
! SAND !! SAND !! CLAY !! CLAY
 
|-
 
| No. of blows per 30cm (N) || Relative density || No. of blows per 30cm (N) || Consistency
 
|-
 
|0-4 || Very loose || Below 2 || Very soft
 
|-
 
| 4-10|| Loose || 2-4 || Soft
 
|-
 
| 10-30 || Medium || 4-8|| Medium
 
|-
 
| 30-50 || Dense || 8-15 || Stiff
 
|-
 
| 50-OVER || Very Dense ||15-30 || Very Stiff
 
|-
 
|  || || Over 30|| Hard
 
|}
 
  
 
(b) Laboratory Soil Test for Civil Engineering purposes<br>
 
(b) Laboratory Soil Test for Civil Engineering purposes<br>
In order to determine the suitable classification of soil materials for dam construction, the following laboratory test should be conducted at soil laboratory.
+
In order to determine the suitable classification of soil materials for dam
 +
construction, the following laboratory tests should be conducted in a soil
 +
laboratory.
  
 
(c) The Tests to be conducted for dam construction:<br>
 
(c) The Tests to be conducted for dam construction:<br>
There are many tests which should be done before project implementation which gives the soil character of the selected area. These are classified as soil mechanical and chemical test.
+
There are many tests which should be done before project implementation
 +
which gives the soil character of the selected area. These are classified as soil
 +
mechanical and chemical test.
  
 
(d) Indicator test or preliminary<br>
 
(d) Indicator test or preliminary<br>
 
In order to determine the soil classification for civil structures, one should know the type of soil and its strength  where the structure will be built by conducting the following laboratory tests;
 
In order to determine the soil classification for civil structures, one should know the type of soil and its strength  where the structure will be built by conducting the following laboratory tests;
 
* Sieve analysis or particle size distribution of the soil materials by percentage. This will determine the percentage of Gravel, Sand, Silt and Clay.
 
* Sieve analysis or particle size distribution of the soil materials by percentage. This will determine the percentage of Gravel, Sand, Silt and Clay.
 
 
* Atterberg limits this will determine the percentage of plasticity of the soil that is Liquid limit, Plastic limit and Plastic index.
 
* Atterberg limits this will determine the percentage of plasticity of the soil that is Liquid limit, Plastic limit and Plastic index.
 
* Bulk density this will determine the unit weight of the soil in g/cm3
 
* Bulk density this will determine the unit weight of the soil in g/cm3
Line 245: Line 347:
  
 
(e) Strength test; or Secondary test.<br>
 
(e) Strength test; or Secondary test.<br>
Shear test, this will determine the cohesion and angle of response of the soil for ultimate bearing calculations
+
Shear test, this will determine the cohesion and angle of response of the soil for ultimate bearing calculations<br>
 
Consolidation test, this will determine the coefficient of volume compression (Mv) and compression index (Cc) of the soil for settlement calculation in soil foundation design.
 
Consolidation test, this will determine the coefficient of volume compression (Mv) and compression index (Cc) of the soil for settlement calculation in soil foundation design.
 
 
* Triaxial test ,this is more advanced than shear test,  it is three force acting on soil sample during the test .This will determine the cohesion of the soil and an angle of friction  for the drained and undrained soil.
 
* Triaxial test ,this is more advanced than shear test,  it is three force acting on soil sample during the test .This will determine the cohesion of the soil and an angle of friction  for the drained and undrained soil.
 
* Proctor test. This will determine the maximum dry density and Optimum moisture content- The parameters will be used for determination of percentage of compaction during the dam, road and Airfield construction. The filling of layer thickness should be 300mm.before compaction.
 
* Proctor test. This will determine the maximum dry density and Optimum moisture content- The parameters will be used for determination of percentage of compaction during the dam, road and Airfield construction. The filling of layer thickness should be 300mm.before compaction.
Line 258: Line 359:
 
The soil must be tested for Chemical concern concrete works such as content of Sulphate, pH value, Sodium chloride and impurities which lower the strength of concrete during hardening.
 
The soil must be tested for Chemical concern concrete works such as content of Sulphate, pH value, Sodium chloride and impurities which lower the strength of concrete during hardening.
  
== 1.5 Occupational Health and Safety ==
+
==Occupational Health and Safety ==
 
In all water supply projects implemented by any funding sources the working environment at the sites will have to comply with the Occupational Health and Safety (OHS) Act (2003), OSH Policy (2010), OSH rules of 2015, 2017, 2018 and any subsequent amendments. These can be accessed on the MoW Website - http://www.maji.go.tz/.
 
In all water supply projects implemented by any funding sources the working environment at the sites will have to comply with the Occupational Health and Safety (OHS) Act (2003), OSH Policy (2010), OSH rules of 2015, 2017, 2018 and any subsequent amendments. These can be accessed on the MoW Website - http://www.maji.go.tz/.
 +
</div>
 +
'''REFERENCES'''<br>
 +
https://www.academia.edu/37842758/Determination_of_the_Flakiness_and_the_
 +
Elongation_Index_for_the_Given_Aggregate_Samplehttp://www.raklab.com/index.
 +
php/testing-services/chemicalhttp://www.concrete.org.uk/fingertipshttp://
 +
www.concrete.org.uk/fingertips-nuggets.asp?cmd=display&id=910
 +
https://civiconcepts.com/2019/01/los-angeles-abrasion-test-on-aggregate/
  
== 1.6 References: ==
 
https://www.academia.edu/37842758/Determination_of_the_Flakiness_and_the_Elongation_Index_for_the_Given_Aggregate_Samplehttp://www.raklab.com/index.php/testing-services/chemicalhttp://www.concrete.org.uk/fingertips-
 
  
http://www.concrete.org.uk/fingertips-nuggets.asp?cmd=display&id=910
+
Previous Page: [[Chapter_Eleven:_Metering|Chapter_Eleven:_Metering]] <<  >> Next Page: [[Chapter_Thirteen:_Role_of_Stakeholders_in_Design_of_Water_Supply_Projects|Chapter_Thirteen:_Role_of_Stakeholders_in_Design_of_Water_Supply_Projects]]
https://civiconcepts.com/2019/01/los-angeles-abrasion-test-on-aggregate/
 

Latest revision as of 16:42, 20 July 2022

1 Chapter Twelve: Design Standards and Specifications

1.1 Design Standards

A Standard is a limit of a measure of quality of a product prepared for judgement and compliance by an authoritative agency, professional or a recognized body.
According to (Business Dictionary, 2020) Standards can be classified as:

  • Government or statutory agency standards and specifications enforced by law,
  • Proprietary standards developed by a firm or organization and placed in public domain to encourage their widespread use, and
  • Voluntary standards established by consultation and consensus and available for use by any person, organization, or industry.

Once established, standards (like bureaucracies) are very difficult to change or dislodge. Standards that apply for water supply and sanitation projects will be as set by the Tanzania Bureau of Standards, and relate to construction works British standards .

The list of institutions whose standards are recommended to be used in designing water projects is shown below:

  • Tanzania Bureau of Standards
  • British Standards (BS)
  • American Society for Testing and Materials (ASTM)
  • Deutsches Institut für Normung (DIN)
  • German institute for standardisation
  • American Association of State Highway and Transportation Officials(AASHTO)
  • European Standards(ES)

Chapter_Twelve:_Design_Standards_and_Specifications

For projects with requirements that are not covered by the above recommended standards, the designer should seek approval from the Tanzania Bureau of Standards (TBS)

1.2 Specifications

Specifications is a detailed description of how work is to be performed or requirements achieved, dimensions met, materials used. These are standards to be followed and tests carried out for the related product to meet acceptance criteria.

Specifications are normally drafted by the client to suit the need for a particular work, for the purpose of construction of water projects standard specifications have been prepared for various woks as follows:

  • Standard Specifications for Civil Works,
  • Standard Specifications for Electrical works,
  • Standard Specifications for Mechanical works and
  • General Specifications.

These documents can be downloaded from Ministry’s Website customized to fit the needs of particular works.

1.3 Materials

1.3.1 Building Materials

Building materialis any material used for construction purposes such as wood, cement, aggregates, metals,sand, bricks, steel, concrete, and clay. These are the most common types of building materials used in construction.The choice of these is based on theircost effectiveness for building projects. Appropriate materials help to guard the designed facilities against wear and tear, corrosive compounds or chemicals.

1.3.2 Materials Testing

Before materials are used for the construction of works, it is imperative for the contractor or the PE to conduct appropriate tests as per applicable standards indicated above. The following are the minimum tests proposed which should be conducted on various construction materials.

1.3.2.1 Aggregates

The test of aggregates explained below includes both fine and coarse aggregates.

Flakiness indextest
Flaky particles are those whose least dimension is 0.6 times lesser than the mean size. The thickness of these particles iscomparatively smaller than for the other two dimensions.

The maximum allowable limit of the flaky particles in amix is 30%. If it exceeds this value then the mix is considered unsuitable for construction purpose. The flakiness index is the percentage by weight of flaky particles in a sample. The flakiness index is calculated by expressing the weight of flaky particles as a percentage of the total weight of the sample, test procedure is as outlined in BS – 812,1995.

Elongation index test
Elongated particles are particles having length considerably larger than the other two dimensions. One such dimension is 1.8 times greater than the other two dimensions. The maximum allowable limit of the flaky particles in the mix is 30%. If it exceeds this value then the mix is considered unsuitable for construction purposes.

An elongation index is the percentage by weight of elongated particles in a sample. The elongated Index is calculated by expressing the weight of elongated particles as a percentage of the total weight of the sample, test method is expalined in BS – 812,1995

Flaky and elongated particles lower the workability of concrete mixes due to the high ratio of surface area to volume. The presence of flaky and elongated particles may also cause inherent weakness in concrete with possibilities of breaking down under heavy loads.

Abrasion (Los Angeles Abrasion Test)
Abrasion test is the measure of aggregate toughness and abrasion resistance on crushing, degradation and disintegration. A test for abrasion is conducted based on BS 812: Part 113: 1990.

Organic impurities test
Sand should be checked for the presence of organic impurities such as decayed vegetation, humus, and coal dust as these affect the quality of concrete. Tests for organic impurities should be conducted as per. BS 812: Part 4: 1976.

Aggregate crushing value (ACV) test
Aggregate crushing value test on coarse aggregates is a relative measure of the resistance of an aggregate crushing under gradually applied compressive load. The method for determination of Aggregate Crushing Value (ACV) is the Code: BS 812 Part 110, 10% finer test.

The 10 per cent Fines Aggregate Crushing Value (10 % FACT) is determined by measuring the load required to crush a prepared aggregate sample to give 10 per cent material passing a specified sieve after crushing. Test procedure is outline as per code BS 812: 1990 Part III.

Impact resistance value (AIC) test
The aggregate impact resistance value is a measure of resistance to sudden impact or shock, this value may differ from resistance to gradually applied compressive load. The procedure of Aggregate impact resistance value is provided in code BS 812 : Part 112 : 1990.

Grading – sieve analysis test
This is classification of a coarse-grained soil based on the different particle sizes it contains. This aspect is important as it indicates the compressibility properties, shear strength and hydraulic conductivity. The standard gradation and sieve analysis test is: BS 812: Section 103.1: Sieve Analysis of Fine and Coarse Aggregates

Absorption test
Water absorption is a measure of the porosity of the aggregates. It gives an indication of the strength of the aggregates. When more water is absorbed, the aggregates is more porous in nature and generally considered unsuitable unless found to be acceptable based on strength, impact and hardness tests. The standard method for Testing aggregates to water absorption test is according to BS 812-120:1989.

Specific gravity test
The specific gravity of aggregate is the ratio of its mass to that of an equal volume of distilled water at a specified temperature. The standard method for Testing aggregates to determine the density is BS 812 : Part 2 : 1995.

Chemical content (pH, Chloride and Sulphate)Test
This test aims at establishing permissible levells of chlorides and sulfates in aggregate, high levels of chemicals may result in deterioration of concrete by corrosion of steel reinforcement.Corrosion of steel affects service ability and strength of concrete structures. The test to determine the content of chemicals in aggregates is conducted as per BS 812-Part 117 & 118:1988.

1.3.2.2 Water

Impurities test
Water for washing aggregates and for mixing concrete shall be in accordance with DIN 4030 and DIN 1045 and shall be clean and free from objectionable quantities of organic matter, alkali, salts and other impurities. When TBS adopts the new standards that are under review as of now, the Tanzanian standards will be adopted.

Chemical content such as chloride, ph values, sulphate
Samples of the water being used or which is proposed to be used for mixing concrete shall undergo testing for quality to determine the concentration of sulphates and chlorides, which shall be such that the concrete mix as a whole complies with the specified limit for salt content. Chemical content in water may be determined through procedure explained in the code APHA 21st:2005 / ICP OES.

1.3.2.3 Cement

Setting time test
The settling time is the time required for cement to convert from a plastic paste to a non-plastic and rigid mass. The cement settling time is determined through procedures explained in the AASHTO T 131 and ASTM C 191: Time of Setting of Hydraulic Cement.

Compressive strength test
The compressive strength of cement is the measure of the strength it provides to the mix after it has hardened .The test enables one to identify the quantity of cement required and how much strength it will provide. The compressive strength of cement is a basic data needed for mix design. Cement, basically identified by its compressive strength as grade 53 grade, 43 grade, 33grade of cement. The test procedure to is as per code of practice BS EN 196-1:2005.

1.3.2.4 Concrete Works

Tests conducted for concrete includes:
Slump test
Concrete slump test or slump cone test is done to determine the workability or consistency of concrete mix prepared in the laboratory or at the construction site when undertaking concreting. Concrete slump test should be carried out from batch to batch to check the uniform quality of concrete during construction. The slump test is carried out as per procedures mentioned in ASTM C143 in the United States, and EN 12350-2 in Europe.

Compressive strenght test:
Compressive strength of concrete is the measure of the Compressive strength which is the ability of the material or the structure to carry the loads on its surface without any cracks or deflection. Standard testing methods for Compressive Strength of Cylindrical Concrete Specimens is carried out using the procedure as stated in the American Society for Testing Materials ASTM C39/C39 M.

Concrete voids test
This test method is related to the susceptibility of the cement paste portion of the concrete to damage by freezing and thawing. The test estimates the likelihood of damage of concrete due to cyclic freezing and thawing. The parameters of the air-void system of hardened concrete can be determined by the procedures described in the code AASHTOT 269.

1.3.2.5 Steel

Tensile strength
The tensile strength of steel is the measure of maximum amount of stress that can be taken before failure. Tensile strength should be conducted as per standards methods as provided in code of practice DIN 15018 or BS449 (1978/1984).

1.4 Soil Test

1.4.1 Methodology of Conducting Soil Investigation for Borehole and Test Pit

There are several methods of soil investigation for engineering purposes.

(a) Borehole drilling method This method used to collect soil materials from underneath by using Rig machine, heavy duty hand auger and light set hand auger. The diameter of the borehole ranges from 150 mm to 180 mm depending on the size of the bit used during drilling, the following should be observed: (i) Visual soil classification and texture should be recorded,
(ii) Water table should be observed and recorded,
(iii) Depth should include the collection of soil material at different depths depending on changes in soil materials to be recorded.
(iv) Labelling of the soil collected at each depth and include its classification
(v) Collection of soil materials and keep in plastic bags to avoid moisture content
(vi) Soil logging or profile should be shown as in the table below.

Chapter_Twelve:_Design_Standards_and_Specifications

(b) Test pit excavation method
This method includesthe digging of test pits with the following dimensions, 1.0 m x 1.5 m to the maximum depth of 2.0 m.The depth depends on hardness of the soil materials or hard rock.The equipment used for this method can be backhoe excavator, hoes and chisels.The collection of soil materials depends on the type of materials as mentioned for the borehole above including soil logging table.

1.4.2 Soil Investigation for Dams

In dam construction projects soil investigation, collection and classification should be done as in the following sections,

a) Along dam axis
The bore holes or test pits should be conducted along the dam axis at intervals of 20 m or 30 m

b) Reservor
The soil shoud be collected in left hand and right hand side towards the fetch area (windward side) at intervals of 30 m.The depth of these Boreholes (BH) and Test Pits (TP) depends on the soil strata and the presence of impervious materials (Clay) and hard rock.

c) Spillway section
The Test pit or boreholes should be conducted along the spillway Chanel to determine the soil materials if it is eroded materials or it is a rock (soft or hard rock) at the interval of 30 m.

d) Borrow area section
The borehole or test pit should be conducted on borrow area to determine the suitable soil materials for dam construction and to quantify the amount of materials to be used for dam construction.

1.4.3 Suitability of Soil Materials for Dam Construction

The soil materials suitable for earthen dam construction are of two types:

  • Silty clay sand of medium plasticity and
  • Silty clay sand of high plasticity

If the materials at the site are predominantly found to have a lot of silty clay sand of medium plasticity, the dam will be homogeneous which means the same character of soil materials will be used. This should contain between 20 to 30 percent clay with balance made up of Silt, sand and some gravel. If a Unified Soil Classification has to be carried out, the selected clays should be in order of presence of, GC, CS, CL, and CH. Normally, homogeneous dams are confined to relatively small heights with maximum of 6m.For dams in excess of 6metres, a zoned embankment is recommended. But if the site has plenty of silty sand clay of high plasticity, the dam will be zoned and both type of soil materials will be used whereby the high clay materials will form the inner part (core) while the medium will be the outer part (shell materials).The above statement depends on the availability of the materials at the selected site. The zoned embankment is more stable.

1.4.4 Determination of In-Situ Bearing Capacity of the Soil

(a) In-situ bearing capacity
The in-situ bearing capacity of the soil should be determined in order to know the bearing capacity of the soil before implementation of the civil structure and can be used for preliminary design of the structure.

There are several methods which are used to conduct in-situ bearing capacity of the soils
(i) Standard penetration test (SPT)
This method is done by drilling boreholes and conducting the SPT tests at the interval of 1.5 m downwards. The number of blows is applied by using a freefalling hammer of 63.5 kg at the height of 750 mm through the rod which is mounted with the cone of 60º at the tip end.

By means of a drop hammer of 63.5 kg mass falling through a height of 750 mm at the rate of 30 blows per minute, the sampler is driven into the soil. This is as per IS -2131:1963 (Indian standards). The number of blows of hammer required to drive a depth of 150mm is counted. The main aim is to perform standard penetration in order to obtain the penetration resistance (N-value).The number or blows required for 300 mm penetration resistance of the soil. It is generally referred to as the ‘N’ value and is measured in blows/unit penetration. The Standard penetration test (SPT) is widely used to get the bearing capacity of the soil directly at a certain depth. The standard penetration test is an in-situ dynamic penetration test designed to provide information on the geotechnical engineering properties of soil.

The main purpose of the test is to provide an indication of the relative density of granular deposits, such as sands and gravels from which it is virtually impossible to obtain undisturbed samples. The operation entails the operator counting the number of hammer strikes it takes to drive the sample tube 6 inches at a time. Each test drives the sample tube up to 450mm deep. It is then extracted and if desired a sample of the soil is pulled from the tube. The borehole is drilled deeper and the test is repeated’

(ii) Dynamic cone penetration (DCP)
This method is the same as above but the dropping hammer is 10kg at a height of 1.m

Table No 12.3 shows indicators for penetration resistance of different types of soils based on the standard penetration tests in relation to the number of blows per 30 cm of penetration (based on Terzaghi and Peck).The table shows relative densities of soils corresponding to the number of blows.

Chapter_Twelve:_Design_Standards_and_Specifications

(b) Laboratory Soil Test for Civil Engineering purposes
In order to determine the suitable classification of soil materials for dam construction, the following laboratory tests should be conducted in a soil laboratory.

(c) The Tests to be conducted for dam construction:
There are many tests which should be done before project implementation which gives the soil character of the selected area. These are classified as soil mechanical and chemical test.

(d) Indicator test or preliminary
In order to determine the soil classification for civil structures, one should know the type of soil and its strength where the structure will be built by conducting the following laboratory tests;

  • Sieve analysis or particle size distribution of the soil materials by percentage. This will determine the percentage of Gravel, Sand, Silt and Clay.
  • Atterberg limits this will determine the percentage of plasticity of the soil that is Liquid limit, Plastic limit and Plastic index.
  • Bulk density this will determine the unit weight of the soil in g/cm3
  • Natural moisture content (NMC) this will determine the percentage of water content of soil before using the materials.
  • Linear shrinkage this will determine the expansion and shrinking of the soil material in percentage.
  • Free swell of the soil this is expressed in percentage to determine the swelling of the soil when subjected to the water.
  • Specific gravity of soil particles this used for calculations of voids in soil
  • Permeability test this indicate the water percolation in soil particle which depends the particle size of the soil particles arrangement and compaction.

(e) Strength test; or Secondary test.
Shear test, this will determine the cohesion and angle of response of the soil for ultimate bearing calculations
Consolidation test, this will determine the coefficient of volume compression (Mv) and compression index (Cc) of the soil for settlement calculation in soil foundation design.

  • Triaxial test ,this is more advanced than shear test, it is three force acting on soil sample during the test .This will determine the cohesion of the soil and an angle of friction for the drained and undrained soil.
  • Proctor test. This will determine the maximum dry density and Optimum moisture content- The parameters will be used for determination of percentage of compaction during the dam, road and Airfield construction. The filling of layer thickness should be 300mm.before compaction.

(f) Chemical tests for dispersion of soil materials used for dam construction
The Total Exchangeable bases such as (Magnesium (Mg+), Sodium (Na+), Calcium (Ca+), and potassium (K+) is the one of the causes of soil dispersion. Generally, the causes of soil dispersion increases with the Sodium percentage. If Na+ of the Total Exchangeable bases is more than 15%, the soil will be dispersed. Soil Texture may contribute to formation of dispersive soils if silt % is greater than 60%.In this case, the hydrometer or sedimentation test should be conducted to determine the percentage of silt and clay separately.

(g) The tests of soil chemical for concrete
The soil must be tested for Chemical concern concrete works such as content of Sulphate, pH value, Sodium chloride and impurities which lower the strength of concrete during hardening.

1.5 Occupational Health and Safety

In all water supply projects implemented by any funding sources the working environment at the sites will have to comply with the Occupational Health and Safety (OHS) Act (2003), OSH Policy (2010), OSH rules of 2015, 2017, 2018 and any subsequent amendments. These can be accessed on the MoW Website - http://www.maji.go.tz/.

REFERENCES
https://www.academia.edu/37842758/Determination_of_the_Flakiness_and_the_ Elongation_Index_for_the_Given_Aggregate_Samplehttp://www.raklab.com/index. php/testing-services/chemicalhttp://www.concrete.org.uk/fingertipshttp:// www.concrete.org.uk/fingertips-nuggets.asp?cmd=display&id=910 https://civiconcepts.com/2019/01/los-angeles-abrasion-test-on-aggregate/