DCOM Volume IV Appendix 3

From Ministry of Water DCOM Manual
Revision as of 11:31, 20 July 2022 by Juma (talk | contribs) (Created page with "'''Appendix 3: Pumping Tests Procedure''' 1. Prior to starting the pump, measure and record the static water level. 2. After starting the pump, measure the corresponding wat...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Appendix 3: Pumping Tests Procedure

1. Prior to starting the pump, measure and record the static water level.

2. After starting the pump, measure the corresponding water levels. Discharge should be greater than the required yield and should be maintained at a constant rate during the entire duration of the test for 24 hours. Measurement intervals should be as follows:

Appendix3.png