Long pages
From Ministry of Water DCOM Manual
Showing below up to 50 results in range #1 to #50.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
- (hist) Chapter Four: Off-Site Sanitation Systems [136,537 bytes]
- (hist) Chapter Four: Off-Site Sanitation Systems:Chapter Four: Off-Site Sanitation Systems [136,268 bytes]
- (hist) CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS [97,261 bytes]
- (hist) Chapter Three: contract management [93,705 bytes]
- (hist) Chapter Twelve: Water Treatment [93,701 bytes]
- (hist) Chapter Seven: Water Treatment [89,310 bytes]
- (hist) Chapter Ten: Pumping Machinery [71,031 bytes]
- (hist) Chapter Nine: Design of Water Structures [61,684 bytes]
- (hist) Chapter Six: Sources of Water Supply [56,129 bytes]
- (hist) Chapter Three: Water Sources Analysis [56,067 bytes]
- (hist) Chapter Fifteen: Operation and Maintenance of Sanitation Projects [53,339 bytes]
- (hist) GENERAL REQUIREMENTS [50,424 bytes]
- (hist) DCOM Volume I Appendix K [49,865 bytes]
- (hist) EARTHWORKS [49,393 bytes]
- (hist) Chapter One: Introduction III [43,552 bytes]
- (hist) Chapter Sixteen: Water Meters, Instrumentation Telemetry and Scada [41,559 bytes]
- (hist) Chapter One:Introduction [39,813 bytes]
- (hist) Chapter One: Introduction [39,685 bytes]
- (hist) Chapter One:Introduction VOL1 [39,657 bytes]
- (hist) Chapter Two: procurement process for water supply and sanitation projects [39,103 bytes]
- (hist) TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING [36,691 bytes]
- (hist) Chapter Four: Water Demand Assessment [34,509 bytes]
- (hist) Chapter Two: Project Planning [34,433 bytes]
- (hist) MISCELLANEOUS BUILDING WORKS [33,716 bytes]
- (hist) Chapter Five: essential basic field construction skills [31,892 bytes]
- (hist) PIPELINES [31,377 bytes]
- (hist) Chapter Four: contract supervision and administration [30,301 bytes]
- (hist) Chapter Three: On-Site Sanitation Systems [27,175 bytes]
- (hist) Chapter Five: Pipelines Design [26,411 bytes]
- (hist) PAINTING AND PROTECTIVE COATING [26,157 bytes]
- (hist) Chapter Eight: Treatment of Waters With Special Contaminants [25,555 bytes]
- (hist) Chapter Nine: Distribution System [25,012 bytes]
- (hist) Chapter Seventeen: Water Audit and Leakage Control [23,332 bytes]
- (hist) Chapter Fourteen: Drinking Water and Wastewater Quality Monitoring, Surveillance and Compliance [21,658 bytes]
- (hist) Chapter Twelve: Design Standards and Specifications [21,539 bytes]
- (hist) TIMBER AND GLAZING [21,406 bytes]
- (hist) SITEWORKS [20,692 bytes]
- (hist) Chapter Eleven: Audit and Conservation of Energy [19,232 bytes]
- (hist) DCOM Volume I Appendix F [17,727 bytes]
- (hist) MASONRY AND PLASTER WORK [17,609 bytes]
- (hist) Chapter Seven: Transmission Mains [17,318 bytes]
- (hist) DCOM Volume I Appendix E [15,863 bytes]
- (hist) Chapter Two: Planning for Sanitation Projects [15,836 bytes]
- (hist) DCOM Volume I Appendix D [15,281 bytes]
- (hist) Chapter Three: Operation and Maintenance Objectives for Water Projects [15,055 bytes]
- (hist) Chapter Nineteen: Community Participation and Compliant Redressal System in Operation and Maintenance of Water Supply and Sanitation Projects [14,735 bytes]
- (hist) ENGINEERING METALWORK [14,682 bytes]
- (hist) Chapter Four: Operation and Maintenance Strategy [13,533 bytes]
- (hist) DCOM Volume I Appendix A [13,360 bytes]
- (hist) Chapter Two: Life Cycle Cost and Service Delivery Approach [13,301 bytes]