Long pages

From Ministry of Water DCOM Manual

Showing below up to 50 results in range #1 to #50.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

  1. (hist) ‎Chapter Four: Off-Site Sanitation Systems ‎[136,537 bytes]
  2. (hist) ‎Chapter Four: Off-Site Sanitation Systems:Chapter Four: Off-Site Sanitation Systems ‎[136,268 bytes]
  3. (hist) ‎CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS ‎[97,261 bytes]
  4. (hist) ‎Chapter Three: contract management ‎[93,705 bytes]
  5. (hist) ‎Chapter Twelve: Water Treatment ‎[93,701 bytes]
  6. (hist) ‎Chapter Seven: Water Treatment ‎[89,310 bytes]
  7. (hist) ‎Chapter Ten: Pumping Machinery ‎[71,031 bytes]
  8. (hist) ‎Chapter Nine: Design of Water Structures ‎[61,684 bytes]
  9. (hist) ‎Chapter Six: Sources of Water Supply ‎[56,129 bytes]
  10. (hist) ‎Chapter Three: Water Sources Analysis ‎[56,067 bytes]
  11. (hist) ‎Chapter Fifteen: Operation and Maintenance of Sanitation Projects ‎[53,339 bytes]
  12. (hist) ‎GENERAL REQUIREMENTS ‎[50,424 bytes]
  13. (hist) ‎DCOM Volume I Appendix K ‎[49,865 bytes]
  14. (hist) ‎EARTHWORKS ‎[49,393 bytes]
  15. (hist) ‎Chapter One: Introduction III ‎[43,552 bytes]
  16. (hist) ‎Chapter Sixteen: Water Meters, Instrumentation Telemetry and Scada ‎[41,559 bytes]
  17. (hist) ‎Chapter One:Introduction ‎[39,813 bytes]
  18. (hist) ‎Chapter One: Introduction ‎[39,685 bytes]
  19. (hist) ‎Chapter One:Introduction VOL1 ‎[39,657 bytes]
  20. (hist) ‎Chapter Two: procurement process for water supply and sanitation projects ‎[39,103 bytes]
  21. (hist) ‎TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING ‎[36,691 bytes]
  22. (hist) ‎Chapter Four: Water Demand Assessment ‎[34,509 bytes]
  23. (hist) ‎Chapter Two: Project Planning ‎[34,433 bytes]
  24. (hist) ‎MISCELLANEOUS BUILDING WORKS ‎[33,716 bytes]
  25. (hist) ‎Chapter Five: essential basic field construction skills ‎[31,892 bytes]
  26. (hist) ‎PIPELINES ‎[31,377 bytes]
  27. (hist) ‎Chapter Four: contract supervision and administration ‎[30,301 bytes]
  28. (hist) ‎Chapter Three: On-Site Sanitation Systems ‎[27,175 bytes]
  29. (hist) ‎Chapter Five: Pipelines Design ‎[26,411 bytes]
  30. (hist) ‎PAINTING AND PROTECTIVE COATING ‎[26,157 bytes]
  31. (hist) ‎Chapter Eight: Treatment of Waters With Special Contaminants ‎[25,555 bytes]
  32. (hist) ‎Chapter Nine: Distribution System ‎[25,012 bytes]
  33. (hist) ‎Chapter Seventeen: Water Audit and Leakage Control ‎[23,332 bytes]
  34. (hist) ‎Chapter Fourteen: Drinking Water and Wastewater Quality Monitoring, Surveillance and Compliance ‎[21,658 bytes]
  35. (hist) ‎Chapter Twelve: Design Standards and Specifications ‎[21,539 bytes]
  36. (hist) ‎TIMBER AND GLAZING ‎[21,406 bytes]
  37. (hist) ‎SITEWORKS ‎[20,692 bytes]
  38. (hist) ‎Chapter Eleven: Audit and Conservation of Energy ‎[19,232 bytes]
  39. (hist) ‎DCOM Volume I Appendix F ‎[17,727 bytes]
  40. (hist) ‎MASONRY AND PLASTER WORK ‎[17,609 bytes]
  41. (hist) ‎Chapter Seven: Transmission Mains ‎[17,318 bytes]
  42. (hist) ‎DCOM Volume I Appendix E ‎[15,863 bytes]
  43. (hist) ‎Chapter Two: Planning for Sanitation Projects ‎[15,836 bytes]
  44. (hist) ‎DCOM Volume I Appendix D ‎[15,281 bytes]
  45. (hist) ‎Chapter Three: Operation and Maintenance Objectives for Water Projects ‎[15,055 bytes]
  46. (hist) ‎Chapter Nineteen: Community Participation and Compliant Redressal System in Operation and Maintenance of Water Supply and Sanitation Projects ‎[14,735 bytes]
  47. (hist) ‎ENGINEERING METALWORK ‎[14,682 bytes]
  48. (hist) ‎Chapter Four: Operation and Maintenance Strategy ‎[13,533 bytes]
  49. (hist) ‎DCOM Volume I Appendix A ‎[13,360 bytes]
  50. (hist) ‎Chapter Two: Life Cycle Cost and Service Delivery Approach ‎[13,301 bytes]

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)