User contributions
From Ministry of Water DCOM Manual
- 23:56, 21 July 2022 diff hist +15 Chapter One: Introduction III →Chapter One: Introduction current
- 16:39, 21 July 2022 diff hist +4 DCOM Volume III Appendix 4 →Appeal process current
- 16:39, 21 July 2022 diff hist +47 DCOM Volume III Appendix 6 current
- 16:38, 21 July 2022 diff hist +63 DCOM Volume III Appendix 4 →Appeal process
- 16:38, 21 July 2022 diff hist 0 N File:Evaluator's.PNG current
- 16:37, 21 July 2022 diff hist +40 DCOM Volume III Appendix 6
- 16:36, 21 July 2022 diff hist +4 DCOM Volume III Appendix 6
- 16:35, 21 July 2022 diff hist +54 DCOM Volume III Appendix 6
- 16:34, 21 July 2022 diff hist 0 N File:Perfomance.jpg current
- 16:34, 21 July 2022 diff hist +9 DCOM Volume III Appendix 4 →Appeal process
- 16:33, 21 July 2022 diff hist +150 DCOM Volume III Appendix 6
- 16:33, 21 July 2022 diff hist +1 DCOM Volume III Appendix 4 →Performance evaluation system
- 16:31, 21 July 2022 diff hist +19 DCOM Volume III Appendix 4 →Appeal process
- 16:31, 21 July 2022 diff hist 0 DCOM Volume III Appendix 6
- 16:30, 21 July 2022 diff hist 0 N File:Contract.jpg current
- 16:27, 21 July 2022 diff hist -146 DCOM Volume III Appendix 6
- 16:26, 21 July 2022 diff hist +45 DCOM Volume III Appendix 6
- 16:25, 21 July 2022 diff hist -17 DCOM Volume III Appendix 6
- 16:25, 21 July 2022 diff hist +406 DCOM Volume III Appendix 6
- 16:19, 21 July 2022 diff hist +35 DCOM Volume III Appendix 4 →Appeal process
- 16:18, 21 July 2022 diff hist +12 DCOM Volume III Appendix 4 →Appeal process
- 16:18, 21 July 2022 diff hist 0 N File:App 54.PNG current
- 16:18, 21 July 2022 diff hist +5 DCOM Volume III Appendix 4 →Contractor response process
- 16:18, 21 July 2022 diff hist 0 N File:App 53.PNG current
- 16:17, 21 July 2022 diff hist 0 N File:App 51.PNG current
- 16:17, 21 July 2022 diff hist 0 N File:App 49.PNG current
- 16:17, 21 July 2022 diff hist +53 DCOM Volume III Appendix 4 →Impact of perfomance evaluation
- 16:17, 21 July 2022 diff hist 0 N File:App 48.PNG current
- 16:15, 21 July 2022 diff hist 0 N File:App 50.PNG current
- 15:57, 21 July 2022 diff hist +23 DCOM Volume III Appendix 4 →Impact of perfomance evaluation
- 15:55, 21 July 2022 diff hist +3,334 DCOM Volume III Appendix 4 →A Contractor whose interim performance is rated CAUTIONARY OR BELOW, in any category, should be requested in writing, to provide, a written response and appropriate corrective action within an acceptable timeframe, in accordance with the Terms and Conditions of the contract documents. Failure of the Contractor do so or if no satisfactory explanation is obtained, the MINISTRY may terminate the Contract.
- 15:49, 21 July 2022 diff hist -8 DCOM Volume III Appendix 5 →REQUIREMENTS OF CQA VALIDATION REPORT current
- 15:43, 21 July 2022 diff hist +10 DCOM Volume III Appendix 5 →WORKS INSPECTION AND TESTING
- 15:42, 21 July 2022 diff hist +6 DCOM Volume III Appendix 5 →ROLES OF THE PARTICIPANTS
- 15:41, 21 July 2022 diff hist +18 DCOM Volume III Appendix 5 →ROLES OF THE PARTICIPANTS
- 15:40, 21 July 2022 diff hist +12 DCOM Volume III Appendix 5 →DEFINITIONS
- 15:40, 21 July 2022 diff hist +4 DCOM Volume III Appendix 5 →INTRODUCTION
- 15:39, 21 July 2022 diff hist +8 DCOM Volume III Appendix 5 →DEFINITIONS
- 15:34, 21 July 2022 diff hist +7,267 DCOM Volume III Appendix 5 →ROLES OF THE PARTICIPANTS
- 15:30, 21 July 2022 diff hist +1 DCOM Volume III Appendix 4 →Impact of perfomance evaluation
- 15:25, 21 July 2022 diff hist +879 DCOM Volume III Appendix 4 →Impact of perfomance evaluation
- 15:22, 21 July 2022 diff hist +962 DCOM Volume III Appendix 4 →Performance evaluation system
- 15:17, 21 July 2022 diff hist +1 DCOM Volume III Appendix 5 →ROLES OF THE PARTICIPANTS
- 15:01, 21 July 2022 diff hist +19 MASONRY AND PLASTER WORK →Mixing current
- 15:00, 21 July 2022 diff hist +67 MASONRY AND PLASTER WORK →Brickwork
- 15:00, 21 July 2022 diff hist +52 MASONRY AND PLASTER WORK →Brickwork
- 14:55, 21 July 2022 diff hist +61 MASONRY AND PLASTER WORK
- 14:54, 21 July 2022 diff hist +348 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS →Performance of Construction Joints and Lifts current
- 13:39, 21 July 2022 diff hist 0 DIN SPECIFICATIONS →DIN SPECIFICATIONS current
- 13:39, 21 July 2022 diff hist 0 EARTHWORKS →EARTHWORKS current
- 13:37, 21 July 2022 diff hist +24 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS →General
- 13:31, 21 July 2022 diff hist +12 MISCELLANEOUS BUILDING WORKS →Fire Protection current
- 13:28, 21 July 2022 diff hist +268 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS →Finish of Concrete Surfaces
- 13:28, 21 July 2022 diff hist +12 PAINTING AND PROTECTIVE COATING →Paint Thickness and Continuity current
- 13:25, 21 July 2022 diff hist +9 TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING →Tiling, flooring, screeds, suspended ceilings and roofing current
- 13:24, 21 July 2022 diff hist +335 TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING →TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING
- 13:04, 21 July 2022 diff hist 0 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS →Curing of Concrete
- 13:02, 21 July 2022 diff hist -2 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS →Trial Mixes
- 13:01, 21 July 2022 diff hist 0 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS →Limits Of Salt Content
- 13:01, 21 July 2022 diff hist +139 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS →Storage of Aggregates
- 12:58, 21 July 2022 diff hist +41 SITEWORKS →SITEWORKS current
- 12:57, 21 July 2022 diff hist +41 PIPELINES →PIPELINES current
- 12:56, 21 July 2022 diff hist +41 PAINTING AND PROTECTIVE COATING →PAINTING AND PROTECTIVE COATING
- 12:55, 21 July 2022 diff hist 0 TIMBER AND GLAZING →timber and glazing current
- 12:54, 21 July 2022 diff hist +42 ENGINEERING METALWORK →ENGINEERING METALWORK current
- 12:53, 21 July 2022 diff hist +41 TIMBER AND GLAZING →TIMBER AND GLAZING
- 12:52, 21 July 2022 diff hist 0 MISCELLANEOUS BUILDING WORKS →MISCELLANEOUS BUILDING WORKS
- 12:50, 21 July 2022 diff hist +41 MISCELLANEOUS BUILDING WORKS →MISCELLANEOUS BUILDING WORKS
- 12:40, 21 July 2022 diff hist -4 TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING →Materials
- 12:38, 21 July 2022 diff hist +83 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS
- 12:37, 21 July 2022 diff hist -12 TIMBER AND GLAZING →Defective Work
- 12:32, 21 July 2022 diff hist -10 TIMBER AND GLAZING
- 12:31, 21 July 2022 diff hist +8 EARTHWORKS →EARTHWORKS
- 12:26, 21 July 2022 diff hist +101 EARTHWORKS →Compaction Test
- 12:19, 21 July 2022 diff hist +4 EARTHWORKS →Disposition Of Excavated Material
- 12:18, 21 July 2022 diff hist +162 EARTHWORKS →Trial Pits
- 12:17, 21 July 2022 diff hist +116 MISCELLANEOUS BUILDING WORKS →Hardware Description
- 12:04, 21 July 2022 diff hist +43 MISCELLANEOUS BUILDING WORKS
- 11:59, 21 July 2022 diff hist +84 ENGINEERING METALWORK
- 11:57, 21 July 2022 diff hist +21 EARTHWORKS →Excess Excavation To Be Made Good
- 11:49, 21 July 2022 diff hist +50 EARTHWORKS
- 11:49, 21 July 2022 diff hist +98 TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING
- 11:44, 21 July 2022 diff hist -9 PAINTING AND PROTECTIVE COATING →Colour Coding
- 11:37, 21 July 2022 diff hist +145 DIN SPECIFICATIONS →Reinforced Concrete
- 11:33, 21 July 2022 diff hist -1 GENERAL REQUIREMENTS →Staff Requirements current
- 11:31, 21 July 2022 diff hist +254 GENERAL REQUIREMENTS →Units of pressure and stress
- 11:29, 21 July 2022 diff hist -4 PAINTING AND PROTECTIVE COATING →Submissions
- 11:27, 21 July 2022 diff hist +33 PAINTING AND PROTECTIVE COATING →Submissions
- 11:23, 21 July 2022 diff hist +100 GENERAL REQUIREMENTS →Units of pressure and stress
- 11:20, 21 July 2022 diff hist +212 GENERAL REQUIREMENTS →Health checks
- 11:16, 21 July 2022 diff hist -4 PAINTING AND PROTECTIVE COATING →Submissions
- 11:16, 21 July 2022 diff hist 0 PAINTING AND PROTECTIVE COATING →Submissions
- 11:15, 21 July 2022 diff hist -1 PAINTING AND PROTECTIVE COATING →Submissions
- 11:15, 21 July 2022 diff hist +62 PAINTING AND PROTECTIVE COATING →Submissions
- 11:09, 21 July 2022 diff hist -4 PAINTING AND PROTECTIVE COATING →PAINTING AND PROTECTIVE COATING
- 11:07, 21 July 2022 diff hist -6 PAINTING AND PROTECTIVE COATING
- 11:06, 21 July 2022 diff hist -4 GENERAL REQUIREMENTS →Overhead power lines
- 11:03, 21 July 2022 diff hist -31 GENERAL REQUIREMENTS →Concrete batching
- 11:02, 21 July 2022 diff hist +1 PIPELINES →Asbestos Cement Pipes
- 11:02, 21 July 2022 diff hist -2 PIPELINES →Stacking Pipes