Long pages
From Ministry of Water DCOM Manual
Showing below up to 50 results in range #21 to #70.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
- (hist) TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING [36,691 bytes]
- (hist) Chapter Four: Water Demand Assessment [34,509 bytes]
- (hist) Chapter Two: Project Planning [34,433 bytes]
- (hist) MISCELLANEOUS BUILDING WORKS [33,716 bytes]
- (hist) Chapter Five: essential basic field construction skills [31,892 bytes]
- (hist) PIPELINES [31,377 bytes]
- (hist) Chapter Four: contract supervision and administration [30,301 bytes]
- (hist) Chapter Three: On-Site Sanitation Systems [27,175 bytes]
- (hist) Chapter Five: Pipelines Design [26,411 bytes]
- (hist) PAINTING AND PROTECTIVE COATING [26,157 bytes]
- (hist) Chapter Eight: Treatment of Waters With Special Contaminants [25,555 bytes]
- (hist) Chapter Nine: Distribution System [25,012 bytes]
- (hist) Chapter Seventeen: Water Audit and Leakage Control [23,332 bytes]
- (hist) Chapter Fourteen: Drinking Water and Wastewater Quality Monitoring, Surveillance and Compliance [21,658 bytes]
- (hist) Chapter Twelve: Design Standards and Specifications [21,539 bytes]
- (hist) TIMBER AND GLAZING [21,406 bytes]
- (hist) SITEWORKS [20,692 bytes]
- (hist) Chapter Eleven: Audit and Conservation of Energy [19,232 bytes]
- (hist) DCOM Volume I Appendix F [17,727 bytes]
- (hist) MASONRY AND PLASTER WORK [17,609 bytes]
- (hist) Chapter Seven: Transmission Mains [17,318 bytes]
- (hist) DCOM Volume I Appendix E [15,863 bytes]
- (hist) Chapter Two: Planning for Sanitation Projects [15,836 bytes]
- (hist) DCOM Volume I Appendix D [15,281 bytes]
- (hist) Chapter Three: Operation and Maintenance Objectives for Water Projects [15,055 bytes]
- (hist) Chapter Nineteen: Community Participation and Compliant Redressal System in Operation and Maintenance of Water Supply and Sanitation Projects [14,735 bytes]
- (hist) ENGINEERING METALWORK [14,682 bytes]
- (hist) Chapter Four: Operation and Maintenance Strategy [13,533 bytes]
- (hist) DCOM Volume I Appendix A [13,360 bytes]
- (hist) Chapter Two: Life Cycle Cost and Service Delivery Approach [13,301 bytes]
- (hist) Chapter Eleven: Metering [13,301 bytes]
- (hist) Chapter Eight: Drinking Water Storage Tanks [12,968 bytes]
- (hist) DCOM Volume III Appendix 1 [12,861 bytes]
- (hist) DCOM Volume I Appendix H [12,754 bytes]
- (hist) Chapter Six: Stakeholder's Participation in Design of Sanitation Projects [12,192 bytes]
- (hist) List of Abbreviations I [12,190 bytes]
- (hist) Chapter Thirteen: Treatment for Special Water Sources [11,508 bytes]
- (hist) Chapter Five: Design Standards and Specifications: Design Standards and Specifications [11,227 bytes]
- (hist) Chapter Five: Design Standards and Specifications:Chapter Five: Design Standards and Specifications [11,163 bytes]
- (hist) Chapter Five: Design Standards and Specifications [11,086 bytes]
- (hist) References IV [10,015 bytes]
- (hist) References: References [9,958 bytes]
- (hist) DCOM Volume III Appendix 5 [9,686 bytes]
- (hist) Chapter Ten: Application Software [9,519 bytes]
- (hist) DCOM Volume III Appendix 3 [8,666 bytes]
- (hist) DCOM Volume III Appendix 4 [8,392 bytes]
- (hist) DCOM Volume I Appendix G [6,530 bytes]
- (hist) Chapter Six: Pumping Systems [5,605 bytes]
- (hist) Chapter Eighteen: Revenue Including billing and Collection [5,561 bytes]
- (hist) Volume IV: Preface [4,612 bytes]