All public logs
From Ministry of Water DCOM Manual
Combined display of all available logs of Ministry of Water DCOM Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 11:03, 16 July 2022 Juma talk contribs uploaded File:Organization 3.PNG
- 11:00, 16 July 2022 Juma talk contribs created page File:Organization 2.PNG
- 11:00, 16 July 2022 Juma talk contribs uploaded File:Organization 2.PNG
- 10:39, 16 July 2022 Juma talk contribs created page File:Organization 1.PNG
- 10:39, 16 July 2022 Juma talk contribs uploaded File:Organization 1.PNG
- 16:40, 15 July 2022 Juma talk contribs created page File:PM ISSUES FINAL PAYMENT.PNG
- 16:40, 15 July 2022 Juma talk contribs uploaded File:PM ISSUES FINAL PAYMENT.PNG
- 16:20, 15 July 2022 Juma talk contribs uploaded a new version of File:Document 6.PNG
- 15:58, 15 July 2022 Juma talk contribs created page File:Document 6.PNG
- 15:58, 15 July 2022 Juma talk contribs uploaded File:Document 6.PNG
- 15:55, 15 July 2022 Juma talk contribs created page Chapter Six: Sources of Water Supply (Created page with "CHAPTER SIX SOURCES OF WATER SUPPLY 6.1 Types of Sources Rain, snow, hail, sleet precipitate upon the surface of the earth as meteorological water and may be considered as...")
- 15:52, 15 July 2022 Juma talk contribs created page Part B (Created page with " PART B: OPERATION AND MAINTENANCE OF THE WATER SUPPLY SOURCES AND NETWORKS Previous Page: Chapter Five: Water Supply and Sanitation Projects << >>...")
- 15:20, 15 July 2022 Juma talk contribs created page File:Document 5.PNG
- 15:20, 15 July 2022 Juma talk contribs uploaded File:Document 5.PNG
- 15:14, 15 July 2022 Juma talk contribs created page File:Document 4.PNG
- 15:14, 15 July 2022 Juma talk contribs uploaded File:Document 4.PNG
- 15:02, 15 July 2022 Juma talk contribs created page File:Document 3.PNG
- 15:02, 15 July 2022 Juma talk contribs uploaded File:Document 3.PNG
- 14:29, 15 July 2022 Juma talk contribs created page File:Document 2.PNG
- 14:29, 15 July 2022 Juma talk contribs uploaded File:Document 2.PNG
- 14:00, 15 July 2022 Juma talk contribs created page File:Figure 5.1.png
- 14:00, 15 July 2022 Juma talk contribs uploaded File:Figure 5.1.png
- 13:49, 15 July 2022 Juma talk contribs created page Chapter Five: Water Supply and Sanitation Projects (Created page with "CHAPTER FIVE WATER SUPPLY AND SANITATION PROJECTS 5.1 Types of Water Supply Schemes Effective Operation and Maintenance calls for an understanding of the types of water su...")
- 13:08, 15 July 2022 Juma talk contribs created page File:Conditions.PNG
- 13:08, 15 July 2022 Juma talk contribs uploaded File:Conditions.PNG
- 12:59, 15 July 2022 Juma talk contribs created page Chapter Four: Operation and Maintenance Strategy (Created page with "CHAPTER FOUR OPERATION AND MAINTENANCE STRATEGY 4.1 Introduction The large investments made to construct utilities intended to provide facilities for water supply and sanit...")
- 12:52, 15 July 2022 Juma talk contribs created page File:Desirable Competencies of a PM.PNG
- 12:52, 15 July 2022 Juma talk contribs uploaded File:Desirable Competencies of a PM.PNG
- 12:18, 15 July 2022 Juma talk contribs created page File:Project Manager’s Responsibilities.PNG
- 12:18, 15 July 2022 Juma talk contribs uploaded File:Project Manager’s Responsibilities.PNG
- 12:04, 15 July 2022 Juma talk contribs created page Chapter Three: Operation and Maintenance Objectives for Water Projects (Created page with "== CHAPTER THREE == == OPERATION AND MAINTENANCE OBJECTIVES FOR WATER PROJECTS == === 3.1 The Concept of Operation and Maintenance === The two core activities of “operatio...")
- 11:48, 15 July 2022 Juma talk contribs created page File:Document 1.PNG
- 11:48, 15 July 2022 Juma talk contribs uploaded File:Document 1.PNG
- 10:58, 15 July 2022 Juma talk contribs created page Chapter Two: Life Cycle Cost and Service Delivery Approach (Created page with "== CHAPTER TWO == == LIFE CYCLE COST AND SERVICE DELIVERY APPROACH == == Heading text == === Life Cycle Cost Approach === Life Cycle Cost (LCC) represents the aggregate costs...")
- 10:51, 15 July 2022 Juma talk contribs created page SITEWORKS (Created page with " 12 SITEWORKS 12.1 Scope The works to be carried out under this chapter comprise various site works as roads and pavements, surface drainage, planting of lawn, shrubs and tre...")
- 10:50, 15 July 2022 Juma talk contribs created page PIPELINES (Created page with " 11 PIPELINES 11.1 Scope This section covers the requirements for pipelines outside structures. The specification for pipe work within structures and up to 600 mm outside th...")
- 10:50, 15 July 2022 Juma talk contribs created page File:Figure 3.1.PNG
- 10:50, 15 July 2022 Juma talk contribs uploaded File:Figure 3.1.PNG
- 10:49, 15 July 2022 Juma talk contribs created page PAINTING AND PROTECTIVE COATING (Created page with " 10 PAINTING AND PROTECTIVE COATING 10.1 General This Specification covers the general requirements and standards of workmanship and the painting and protective coatings requ...")
- 10:47, 15 July 2022 Juma talk contribs created page ENGINEERING METALWORK (Created page with " 9 ENGINEERING METALWORK 9.1 Scope This section sets out the general requirements for the engineering metalwork required in the works. 9.1.1 General The permissible design str...")
- 10:38, 15 July 2022 Juma talk contribs created page Chapter Two: procurement process for water supply and sanitation projects (Created page with "==management== adhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh")
- 10:23, 15 July 2022 Juma talk contribs created page Chapter Three: contract management (Created page with "=CHAPTER THREE CONTRACT MANAGEMENT= ==Importance of Contract Management== Contract management involves activities performed by a PE after a contract has been awarded to determ...")
- 10:18, 15 July 2022 Juma talk contribs created page MISCELLANEOUS BUILDING WORKS (Created page with " 8 MISCELLANEOUS BUILDING WORKS 8.1 Scope This specification covers the general requirements for, but is not limited to, sundry items, finish hardware, sanitary installation,...")
- 10:18, 15 July 2022 Juma talk contribs created page TIMBER AND GLAZING (Created page with " 7 TIMBER AND GLAZING 7.1 Scope This Specification covers the requirements for, but is not limited to, all carpentry, joinery and glazing works. 7.2 Timber 7.2.1 General A h...")
- 10:17, 15 July 2022 Juma talk contribs created page TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING (Created page with " 6 TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING 6.1 Scope This Specification covers the requirements for tiling, flooring, screeds, suspended ceilings and roofin...")
- 10:16, 15 July 2022 Juma talk contribs created page MASONRY AND PLASTER WORK (Created page with " 5 MASONRY AND PLASTER WORK 5.1 Scope This Specification covers the requirements for masonry work and plaster work. 5.2 Masonry work 5.2.1 Materials 5.2.1.1 Bricks and blocks...")
- 10:14, 15 July 2022 Juma talk contribs created page CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS (Created page with " 4 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS 4.1 General This section covers all requirements concerning concrete, reinforcement and formwork . For clarity, this section...")
- 10:11, 15 July 2022 Juma talk contribs created page EARTHWORKS (Created page with " 3 EARTHWORKS 3.1 General 3.1.1 Scope This Specification covers the requirements for site clearance, demolition, excavation, shoring, backfilling, compaction, importation or e...")
- 10:08, 15 July 2022 Juma talk contribs created page DIN SPECIFICATIONS (Created page with "== 2 DIN SPECIFICATIONS == This Specification sets out, but not limited to, the main DIN standards to be used by Contractor for the design, construction, supply and erection o...")
- 10:05, 15 July 2022 Juma talk contribs created page GENERAL REQUIREMENTS (Created page with "== GENERAL REQUIREMENTS == 1.1 Permissions being obtained by the Employer The Site of the Permanent Works is shown on the drawings accompanying these Employer’s Requirement...")