User contributions
From Ministry of Water DCOM Manual
- 11:03, 15 July 2022 diff hist +1 Chapter Two: Life Cycle Cost and Service Delivery Approach
- 11:02, 15 July 2022 diff hist +1 Chapter Three: contract management →Importance of Contract Management
- 11:02, 15 July 2022 diff hist -4 Chapter Two: Life Cycle Cost and Service Delivery Approach
- 11:01, 15 July 2022 diff hist +4 Chapter Three: contract management →Importance of Contract Management
- 11:01, 15 July 2022 diff hist +4 Chapter Two: Life Cycle Cost and Service Delivery Approach
- 11:00, 15 July 2022 diff hist +74 Chapter Three: contract management →Chapter Three: contract management
- 10:58, 15 July 2022 diff hist +12,984 N Chapter Two: Life Cycle Cost and Service Delivery Approach Created page with "== CHAPTER TWO == == LIFE CYCLE COST AND SERVICE DELIVERY APPROACH == == Heading text == === Life Cycle Cost Approach === Life Cycle Cost (LCC) represents the aggregate costs..."
- 10:51, 15 July 2022 diff hist +221 Chapter One:Introduction
- 10:51, 15 July 2022 diff hist +20,692 N SITEWORKS Created page with " 12 SITEWORKS 12.1 Scope The works to be carried out under this chapter comprise various site works as roads and pavements, surface drainage, planting of lawn, shrubs and tre..."
- 10:50, 15 July 2022 diff hist +31,413 N PIPELINES Created page with " 11 PIPELINES 11.1 Scope This section covers the requirements for pipelines outside structures. The specification for pipe work within structures and up to 600 mm outside th..."
- 10:50, 15 July 2022 diff hist 0 N File:Figure 3.1.PNG current
- 10:49, 15 July 2022 diff hist +26,037 N PAINTING AND PROTECTIVE COATING Created page with " 10 PAINTING AND PROTECTIVE COATING 10.1 General This Specification covers the general requirements and standards of workmanship and the painting and protective coatings requ..."
- 10:48, 15 July 2022 diff hist +4 Chapter One:Introduction →Water Supply and Sanitation Public Private Partnership in Tanzania
- 10:47, 15 July 2022 diff hist +14,556 N ENGINEERING METALWORK Created page with " 9 ENGINEERING METALWORK 9.1 Scope This section sets out the general requirements for the engineering metalwork required in the works. 9.1.1 General The permissible design str..."
- 10:43, 15 July 2022 diff hist -158 Chapter Two: procurement process for water supply and sanitation projects Blanked the page Tag: Blanking
- 10:41, 15 July 2022 diff hist -3 Chapter One:Introduction →Sustainable Development Goals (SDGs)
- 10:40, 15 July 2022 diff hist +35 Chapter Three: contract management
- 10:39, 15 July 2022 diff hist +86 Chapter Two: procurement process for water supply and sanitation projects →management
- 10:38, 15 July 2022 diff hist -6 Chapter One:Introduction →Sustainable Development Goals (SDGs)
- 10:38, 15 July 2022 diff hist +72 N Chapter Two: procurement process for water supply and sanitation projects Created page with "==management== adhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh"
- 10:33, 15 July 2022 diff hist +2 Chapter Three: contract management
- 10:32, 15 July 2022 diff hist +10 Chapter One:Introduction →References
- 10:28, 15 July 2022 diff hist -2 Chapter One:Introduction →References
- 10:28, 15 July 2022 diff hist -36 Chapter Three: contract management
- 10:27, 15 July 2022 diff hist +11 Chapter One:Introduction →Purpose of this Volume
- 10:25, 15 July 2022 diff hist +343 List of Abbreviations I
- 10:25, 15 July 2022 diff hist 0 Chapter Three: contract management
- 10:25, 15 July 2022 diff hist +3 Chapter One:Introduction →Organisation of the 4th Edition DCOM Manual
- 10:24, 15 July 2022 diff hist +46 Chapter One:Introduction →Organisation of the 4th Edition DCOM Manual
- 10:23, 15 July 2022 diff hist +2,076 N Chapter Three: contract management Created page with "=CHAPTER THREE CONTRACT MANAGEMENT= ==Importance of Contract Management== Contract management involves activities performed by a PE after a contract has been awarded to determ..."
- 10:22, 15 July 2022 diff hist +1 Chapter One:Introduction →About the Fourth Edition of DCOM Manual
- 10:20, 15 July 2022 diff hist +8 Chapter One:Introduction →Water Supply and Sanitation Public Private Partnership in Tanzania
- 10:19, 15 July 2022 diff hist +1 Chapter One:Introduction →Water Supply and Sanitation Public Private Partnership in Tanzania
- 10:18, 15 July 2022 diff hist +33,504 N MISCELLANEOUS BUILDING WORKS Created page with " 8 MISCELLANEOUS BUILDING WORKS 8.1 Scope This specification covers the general requirements for, but is not limited to, sundry items, finish hardware, sanitary installation,..."
- 10:18, 15 July 2022 diff hist +21,387 N TIMBER AND GLAZING Created page with " 7 TIMBER AND GLAZING 7.1 Scope This Specification covers the requirements for, but is not limited to, all carpentry, joinery and glazing works. 7.2 Timber 7.2.1 General A h..."
- 10:17, 15 July 2022 diff hist +3 Chapter One:Introduction →Major Stakeholders in Water Supply and Sanitation Projects
- 10:17, 15 July 2022 diff hist +36,253 N TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING Created page with " 6 TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING 6.1 Scope This Specification covers the requirements for tiling, flooring, screeds, suspended ceilings and roofin..."
- 10:16, 15 July 2022 diff hist +5 Chapter One:Introduction →Major Stakeholders in Water Supply and Sanitation Projects
- 10:16, 15 July 2022 diff hist +17,410 N MASONRY AND PLASTER WORK Created page with " 5 MASONRY AND PLASTER WORK 5.1 Scope This Specification covers the requirements for masonry work and plaster work. 5.2 Masonry work 5.2.1 Materials 5.2.1.1 Bricks and blocks..."
- 10:15, 15 July 2022 diff hist +10 Chapter One:Introduction →Development Agenda and Water and Sanitation Sector in Tanzania
- 10:14, 15 July 2022 diff hist +96,401 N CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS Created page with " 4 CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS 4.1 General This section covers all requirements concerning concrete, reinforcement and formwork . For clarity, this section..."
- 10:11, 15 July 2022 diff hist +8 Chapter One:Introduction →International Water Law
- 10:11, 15 July 2022 diff hist +49,047 N EARTHWORKS Created page with " 3 EARTHWORKS 3.1 General 3.1.1 Scope This Specification covers the requirements for site clearance, demolition, excavation, shoring, backfilling, compaction, importation or e..."
- 10:10, 15 July 2022 diff hist +17 Chapter One:Introduction →Public Private Partnership in Water Supply and Sanitation Projects in Developing Countries
- 10:09, 15 July 2022 diff hist +1 Chapter One:Introduction →Climate Change and Resilience to Climate Change
- 10:08, 15 July 2022 diff hist +2,843 N DIN SPECIFICATIONS Created page with "== 2 DIN SPECIFICATIONS == This Specification sets out, but not limited to, the main DIN standards to be used by Contractor for the design, construction, supply and erection o..."
- 10:08, 15 July 2022 diff hist +1 Chapter One:Introduction →Climate Change and Resilience to Climate Change
- 10:05, 15 July 2022 diff hist +49,696 N GENERAL REQUIREMENTS Created page with "== GENERAL REQUIREMENTS == 1.1 Permissions being obtained by the Employer The Site of the Permanent Works is shown on the drawings accompanying these Employer’s Requirement..."
- 10:05, 15 July 2022 diff hist +2 Chapter One:Introduction
- 10:05, 15 July 2022 diff hist -49,699 Appendix N: Specifications Replaced content with "540px|link=Preface <h4>DCOM Standard Specifications </h4> Readmore...or Download :File:DCOM_Standard_Specifications..." current Tag: Replaced