Search results

From Ministry of Water DCOM Manual
  • ...& (B): E-Water Point in Sangara Village, Babati. A Token Used by E-Water Users to Get Water............221 <br>
    1 KB (105 words) - 09:13, 17 July 2022
  • ...fixed rate for some minimum level of consumption to benefit the low income users, and higher rates for those who use greater quantities of water,<br> ...in consultation with the users, considering basically the capacity of the users to pay and costs of the O&M, as well as other relevant factors.
    5 KB (858 words) - 13:59, 20 July 2022
  • extended durations. On the other hand, most of small scale users in rural areas ...cting water tariffs and they offer a high level of convenience to both the users and the local water supply authorities. They save time and do not require a
    13 KB (2,026 words) - 16:39, 20 July 2022
  • (b) Are intended users or beneficiaries including those who register the CBWSOs,<br> solutions. It is much better to try to identify any unintended users at an early
    12 KB (1,793 words) - 06:20, 21 July 2022
  • • communicating with users, stakeholders and clients;<br> ...strategies and protocols will be used to communicate with the Contractor, users and key stakeholders:<br>
    13 KB (1,716 words) - 13:46, 20 July 2022
  • welcomes comments on this new edition of the DCOM Manual from users in
    4 KB (555 words) - 23:09, 20 July 2022
  • welcomes comments on this new edition of the DCOM Manual from users in
    4 KB (556 words) - 10:19, 21 July 2022
  • welcomes comments on this new edition of the DCOM Manual from users in
    4 KB (555 words) - 10:26, 21 July 2022
  • welcomes comments on this new edition of the DCOM Manual from users in
    4 KB (557 words) - 10:46, 21 July 2022
  • welcomes comments on this new edition of the DCOM Manual from users in
    4 KB (552 words) - 15:06, 18 July 2022
  • InfoWater - InfoWater Pro modelling and management software enables users to data. GIS applications are tools that allow users to create interactive queries
    9 KB (1,308 words) - 16:35, 20 July 2022
  • ...on the O&M expenditure ceilings and the socio-economic condition of water users. ...ary organizations/NGOs to create the needed awareness among water services users as well for the general public.
    13 KB (2,033 words) - 09:31, 17 July 2022
  • • To enable the correct provision of services and benefits to end-users; • To ensure that end-users are made directly responsible for the O&M of the installed facilities, henc
    15 KB (2,221 words) - 12:05, 16 July 2022
  • * Daily needs and instantaneous demand of the users;
    5 KB (865 words) - 16:23, 20 July 2022
  • ...ofile of a water supply system including its distribution system and water users, thereby facilitating easier and effective management of the resources with ...r supplied, water delivered to metered users, water delivered to unmetered users, water losses and suggested measures to address water loss (through pinpoin
    23 KB (3,623 words) - 13:56, 20 July 2022
  • ...he record of the project– and implementation- focused approaches, in which users initially enjoy good services after construction of drinking water supply a ...specific reference to their functioning and adequacy to meet the needs of users, thus enabling the agency to evaluate the performance of installations in p
    13 KB (1,911 words) - 09:29, 17 July 2022
  • communication between the planners and intended future users. Consequently, The preferences of all sanitation users should be considered, including men,
    15 KB (2,303 words) - 11:14, 22 June 2021
  • ...s and deterioration of quality of water. Sometimes, even legally connected users draw water by sucking through motors causing reduction in pressures.
    24 KB (3,743 words) - 09:42, 17 July 2022
  • to the users. The majority of the agreements are currently in place in the short assurance of improved water supply and sanitation services to the water users
    39 KB (5,755 words) - 10:29, 21 July 2022
  • to the users. The majority of the agreements are currently in place in the short assurance of improved water supply and sanitation services to the water users
    39 KB (5,753 words) - 10:36, 21 July 2022
  • ...operators may be best placed to provide services as they are close to the users. The majority of the agreements are currently in place in the short term (1 ...he assurance of improved water supply and sanitation services to the water users and to identify and preserve water sources.
    39 KB (5,742 words) - 10:53, 17 July 2022
  • to the users. The majority of the agreements are currently in place in the short assurance of improved water supply and sanitation services to the water users
    43 KB (6,276 words) - 23:56, 21 July 2022
  • Table 4.1: Minimum water requirements for various categorised domestic users ................................................71<br>
    12 KB (1,133 words) - 10:38, 21 July 2022
  • ...places where both low and high flows can occur due to several consumptions users. These wide flow ranges are measured by using a built-in changeover valve t ...collecting water tariffs and offer a high level of convenience to both the users and local water supply authorities. They save time and do not require unnec
    41 KB (6,663 words) - 13:47, 20 July 2022
  • ...strict Metering Areas (DMAs) which are separated by bulk meters to monitor users and water losses are also used.
    17 KB (2,704 words) - 09:36, 17 July 2022
  • future users should be involved in the data-gathering process at the intended
    17 KB (2,908 words) - 16:10, 14 June 2021
  • prepared to guide the users on project economic analysis since the matter is the movements and practices of outlet users (and of women and children in
    60 KB (9,601 words) - 16:31, 20 July 2022
  • ...sary to have a community ownership and management approach, making the end-users directly responsible for the operation and maintenance of the installed fac ...hich heavily relies on the correct operation from the user’s side, the end-users have to be properly trained to ensure that they will operate the systems co
    52 KB (8,268 words) - 13:36, 20 July 2022
  • disrupting service to all or a great number of users in the network. Figure 5.2
    26 KB (4,105 words) - 16:17, 20 July 2022
  • and sub-catchment committees to ensure all water users with water withdrawal developmental constraints are faced as a result of ignoring other users. It will
    55 KB (8,696 words) - 16:02, 20 July 2022
  • ...the tank is taken as 130 litres to 70 litres per head. For small number of users 130 litres per head is sufficient. ..., a 100 mm sewer laid at a gradient of 1m in 200 m will serve around 2,800 users with a wastewater flow of 60 L/person/day. PVC pipes are recommended for us
    133 KB (20,812 words) - 09:51, 21 July 2022
  • ...the tank is taken as 130 litres to 70 litres per head. For small number of users 130 litres per head is sufficient. ..., a 100 mm sewer laid at a gradient of 1m in 200 m will serve around 2,800 users with a wastewater flow of 60 L/person/day. PVC pipes are recommended for us
    133 KB (20,749 words) - 05:53, 21 July 2022
  • ...is primarily aiming at sustainable development of the resource for various users. A key issue of sustainable groundwater is balancing the available resource
    55 KB (8,793 words) - 12:18, 19 July 2022
  • ...f responsible maintenance team. As such it can be used by the water system users committee for further details of maintenance.
    69 KB (11,227 words) - 13:28, 20 July 2022
  • Good contract administration assures that the end users are satisfied with the product or service being obtained under the contract
    92 KB (14,604 words) - 09:00, 21 July 2022