Pages with the fewest revisions

From Ministry of Water DCOM Manual

Showing below up to 100 results in range #21 to #120.

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

  1. Part D‏‎ (2 revisions)
  2. Acknowledgements VOL.1‏‎ (2 revisions)
  3. Part E‏‎ (2 revisions)
  4. Acknowledgements VOL2‏‎ (2 revisions)
  5. List of Special Committee Members IV‏‎ (2 revisions)
  6. DCOM Volume IV Appendix 6‏‎ (3 revisions)
  7. Chapter Eight: Drinking Water Storage Tanks‏‎ (3 revisions)
  8. ENGINEERING METALWORK‏‎ (3 revisions)
  9. ReferencesIII: References‏‎ (3 revisions)
  10. DCOM Volume IV Appendix 10‏‎ (3 revisions)
  11. DCOM Volume IV Appendix 2‏‎ (3 revisions)
  12. DCOM Volume IV Appendix 3‏‎ (3 revisions)
  13. DCOM Volume I Appendix J‏‎ (3 revisions)
  14. DCOM Volume IV Appendix 4‏‎ (3 revisions)
  15. Acknowledgements VOL3‏‎ (3 revisions)
  16. Chapter Two: Planning for Sanitation Projects‏‎ (3 revisions)
  17. DCOM Volume I Appendix M‏‎ (4 revisions)
  18. DCOM Volume IV Appendix 8‏‎ (4 revisions)
  19. Chapter Ten: Application Software‏‎ (4 revisions)
  20. Chapter Nine: Distribution System‏‎ (4 revisions)
  21. List of Abbreviations 4‏‎ (4 revisions)
  22. Chapter Nineteen: Community Participation and Compliant Redressal System in Operation and Maintenance of Water Supply and Sanitation Projects‏‎ (4 revisions)
  23. DCOM Volume I Appendix F‏‎ (4 revisions)
  24. Part A‏‎ (4 revisions)
  25. Chapter Five: Design Standards and Specifications‏‎ (4 revisions)
  26. DCOM Volume I Appendix L‏‎ (4 revisions)
  27. DCOM Specification‏‎ (5 revisions)
  28. DCOM Volume IV Appendix 9‏‎ (5 revisions)
  29. MASONRY AND PLASTER WORK‏‎ (5 revisions)
  30. References IV‏‎ (5 revisions)
  31. DCOM Volume III Appendix 3‏‎ (5 revisions)
  32. DCOM Volume I Appendix C‏‎ (5 revisions)
  33. Subject Index : Subject Index‏‎ (5 revisions)
  34. TILING, FLOORING, SCREEDS, SUSPENDED CEILINGS AND ROOFING‏‎ (5 revisions)
  35. TIMBER AND GLAZING‏‎ (5 revisions)
  36. Chapter Seven: Transmission Mains‏‎ (5 revisions)
  37. List of Special Committee Members volume III‏‎ (6 revisions)
  38. References: References‏‎ (6 revisions)
  39. MISCELLANEOUS BUILDING WORKS‏‎ (6 revisions)
  40. Chapter Eighteen: Revenue Including billing and Collection‏‎ (6 revisions)
  41. SITEWORKS‏‎ (6 revisions)
  42. Chapter Three: On-Site Sanitation Systems‏‎ (6 revisions)
  43. Chapter Six: Stakeholder's Participation in Design of Sanitation Projects‏‎ (7 revisions)
  44. DIN SPECIFICATIONS‏‎ (7 revisions)
  45. DCOM Volume I Appendix A‏‎ (7 revisions)
  46. DCOM Volume IV Appendix 1‏‎ (7 revisions)
  47. DCOM Volume I Appendix G‏‎ (7 revisions)
  48. DCOM Volume IV Appendix 5‏‎ (7 revisions)
  49. EARTHWORKS‏‎ (8 revisions)
  50. Subject Index: Subject Index‏‎ (8 revisions)
  51. Chapter Eleven: Metering‏‎ (8 revisions)
  52. PIPELINES‏‎ (8 revisions)
  53. Chapter Seventeen: Water Audit and Leakage Control‏‎ (8 revisions)
  54. List of Tables‏‎ (9 revisions)
  55. CONCRETE, REINFORCEMENT, FORMWORK AND JOINTS‏‎ (9 revisions)
  56. DCOM Volume I Appendix B‏‎ (10 revisions)
  57. List of Abbreviations IV‏‎ (10 revisions)
  58. Volume II: Preface‏‎ (10 revisions)
  59. Chapter Four: contract supervision and administration‏‎ (11 revisions)
  60. DCOM Volume III Appendix 5‏‎ (11 revisions)
  61. DCOM Volume I Appendix E‏‎ (11 revisions)
  62. DCOM Volume III Appendix 6‏‎ (11 revisions)
  63. DCOM Volume I Appendix I‏‎ (11 revisions)
  64. Appendix N: Specifications‏‎ (12 revisions)
  65. Chapter Four: Operation and Maintenance Strategy‏‎ (12 revisions)
  66. PAINTING AND PROTECTIVE COATING‏‎ (12 revisions)
  67. List of Abbreviations III‏‎ (12 revisions)
  68. Chapter Eleven: Audit and Conservation of Energy‏‎ (13 revisions)
  69. Chapter Thirteen: Treatment for Special Water Sources‏‎ (13 revisions)
  70. List of Figures‏‎ (13 revisions)
  71. Chapter Eight: Treatment of Waters With Special Contaminants‏‎ (15 revisions)
  72. Chapter Thirteen: Role of Stakeholders in Design of Water Supply Projects‏‎ (15 revisions)
  73. Chapter Three: Operation and Maintenance Objectives for Water Projects‏‎ (15 revisions)
  74. Chapter Six: Pumping Systems‏‎ (16 revisions)
  75. DCOM Volume I Appendix D‏‎ (17 revisions)
  76. Chapter Five: Water Supply and Sanitation Projects‏‎ (17 revisions)
  77. Chapter Sixteen: Water Meters, Instrumentation Telemetry and Scada‏‎ (19 revisions)
  78. List of Abbreviations‏‎ (19 revisions)
  79. GENERAL REQUIREMENTS‏‎ (20 revisions)
  80. DCOM Volume III Appendix 4‏‎ (20 revisions)
  81. Volume III: Preface‏‎ (20 revisions)
  82. Acknowledgements‏‎ (21 revisions)
  83. Preface‏‎ (22 revisions)
  84. Chapter Fourteen: Drinking Water and Wastewater Quality Monitoring, Surveillance and Compliance‏‎ (23 revisions)
  85. Chapter Nine: Design of Water Structures‏‎ (23 revisions)
  86. DCOM Volume I Appendix K‏‎ (26 revisions)
  87. Volume IV: Preface‏‎ (26 revisions)
  88. List of Abbreviations I‏‎ (27 revisions)
  89. Chapter One: Introduction III‏‎ (28 revisions)
  90. Chapter Twelve: Water Treatment‏‎ (28 revisions)
  91. Chapter Fifteen: Operation and Maintenance of Sanitation Projects‏‎ (29 revisions)
  92. Chapter Five: essential basic field construction skills‏‎ (29 revisions)
  93. List of Figures IV‏‎ (30 revisions)
  94. Chapter Two: Life Cycle Cost and Service Delivery Approach‏‎ (30 revisions)
  95. Chapter Three: contract management‏‎ (31 revisions)
  96. Chapter Twelve: Design Standards and Specifications‏‎ (33 revisions)
  97. Chapter Five: Pipelines Design‏‎ (33 revisions)
  98. List of Special Committee Members‏‎ (33 revisions)
  99. Chapter Two: Project Planning‏‎ (35 revisions)
  100. List of Tables IV‏‎ (36 revisions)

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)